| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20106693 | Name of Scheme: KALUWALA WSS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 3543 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 14-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well (2) | 52.01/248.66 | Kaluwala | 29.44643 | 78.798994 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pUMP | 740 / 52 | Kaluwala | 29.44643 | 78.798994 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225/16 | Kaluwala | 29.44643 | 78.798994 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- K7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 11.562 | |
| 2 | HDPE | 75 | 3.284 | |
| 3 | HDPE | 90 | 9.502 | |
| 4 | HDPE | 110 | 0.908 | |
| 5 | HDPE | 125 | 1.894 | |
| 6 | HDPE | 140 | 1.046 | |
| 7 | HDPE | 160 | 0.476 | |
| 8 | HDPE | 180 | 0.090 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 540 |