| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359227 | Name of Scheme: AMRAPUR W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1729 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jun-2026 | Actual Date of Completion (Capex): 23-Oct-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.0 / 108.22 | AMRAPUR | 27.4778351 | 79.2943301 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 1000 LPM/ 49M | AMRAPUR | 27.4778351 | 79.2943301 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100KL / 12 M | AMRAPUR | 27.4778351 | 79.2943301 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 80 | 0.028 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.089 | COMPLETE |
| 2 | HDPE | 75 | 0.376 | COMPLETE |
| 3 | HDPE | 90 | 0.797 | COMPLETE |
| 4 | HDPE | 140 | 2.541 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 352 |