Project Completion Certificate (Ground Water)
Scheme ID: 8359403 Name of Scheme: Barahar No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1805 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 15-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.0 M / 111.56 M Barahar 26.730119 79.454378
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (30.3 M3/Hr.) / 61 Mtr. Barahar 26.730119 79.454378
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 16.0 M Barahar 26.730151 79.454216
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.323
2 HDPE 75 1.991
3 HDPE 90 0.457
4 HDPE 110 1.101
5 HDPE 140 0.418
HSC Connection
Sno. Total Nos.
1 311
Other Details
1.70
1.79
1.79
09-Jun-2025
10-Jun-2025