| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359403 | Name of Scheme: Barahar | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 1805 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 15-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.0 M / 111.56 M | Barahar | 26.730119 | 79.454378 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (30.3 M3/Hr.) / 61 Mtr. | Barahar | 26.730119 | 79.454378 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 16.0 M | Barahar | 26.730151 | 79.454216 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.011 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.323 | |
| 2 | HDPE | 75 | 1.991 | |
| 3 | HDPE | 90 | 0.457 | |
| 4 | HDPE | 110 | 1.101 | |
| 5 | HDPE | 140 | 0.418 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 311 |