Project Completion Certificate (Ground Water)
Scheme ID: 8359407 Name of Scheme: Dhanwali No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3040 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 20-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.07 M / 58.27 M DHANWALI 26.797446* 79.450875*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE (50.0 M3/ Hr.) / 54 M DHANWALI 26.797446* 79.450875*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 16 M DHANWALI 26.797483* 79.450819*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.617
2 HDPE 75 0.443
3 HDPE 90 2.035
4 HDPE 110 0.097
5 HDPE 140 0.853
6 HDPE 160 0.190
HSC Connection
Sno. Total Nos.
1 365
Other Details
2.05
1.89
1.89
31-Mar-2024
01-Apr-2024