Project Completion Certificate (Ground Water)
Scheme ID: 8359753 Name of Scheme: Mahri Water Supply No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1750 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 01-Sep-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/136 Mahri 29.74 74.84
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 24/41 Mahri 29.74 74.84
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/12 Mahri 29.74 74.84
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.01 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.27 Laying Completed
2 HDPE 75 2.79 Laying Completed
3 HDPE 90 0.23 Laying Completed
4 HDPE 110 0.12 Laying Completed
5 HDPE 140 0.13 Laying Completed
HSC Connection
Sno. Total Nos.
1 312
Other Details
1.85
0.00
1.80
07-Dec-2024
01-Sep-2026