Project Completion Certificate (Ground Water)
Scheme ID: 8360408 Name of Scheme: LAMBA KHERA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3106 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 26-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30.07 MTR /121.54 MTR LAMBA KHERA 29.204672 78.526878
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 15.0 HP 700 LMP/54 MTR LAMBA KHERA 29.204672 78.526878
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL/12MTR LAMBA KHERA 29.204744 78.526728
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 110 0.190
2 HDPE PIPE PN-6: CLASS PE-100 90 0.662
3 HDPE PIPE PN-6: CLASS PE-100 75 1.087
4 HDPE PIPE PN-6: CLASS PE-100 63 4.003
5 HDPE PIPE PN-6: CLASS PE-100 125 0.092
6 HDPE PIPE PN-6: CLASS PE-100 160 0.014
7 HDPE PIPE PN-6: CLASS PE-100 140 0.142
HSC Connection
Sno. Total Nos.
1 728
Other Details
2.25
2.06
2.25
24-Dec-2024
25-Dec-2024