Project Completion Certificate (Ground Water)
Scheme ID: 8360553 Name of Scheme: Chakia No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2240 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 05-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.02/125.79 Chakia 26.89 83.50
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33/40 Chakia 26.89 83.50
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 175/12 Chakia 26.89 83.50
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.012 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.611 Laying Completed
2 HDPE 75 3.25 Laying Completed
3 HDPE 90 0.43 Laying Completed
4 HDPE 110 0.695 Laying Completed
5 HDPE 140 0.138 Laying Completed
HSC Connection
Sno. Total Nos.
1 376
Other Details
2.60
0.00
2.31
04-Apr-2024
01-Sep-2026