Project Completion Certificate (Ground Water)
Scheme ID: 8360917 Name of Scheme: Baksha No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 3245 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 14-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 18.05/58.54 Baksha 25.787856 82.57445
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-15HP 700/50 Baksha 25.787856 82.57445
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL-16M Baksha 25.787794 82.574337
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 160 0.755
2 HDPE PIPE PN-6 140 0.224
3 HDPE PIPE PN-6 110 0.789
4 HDPE PIPE PN-6 90 1.167
5 HDPE PIPE PN-6 75 1.177
6 HDPE PIPE PN-6 63 17.445
HSC Connection
Sno. Total Nos.
1 480
Other Details
3.16
3.14
2.96
14-May-2026
15-May-2026