| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8360917 | Name of Scheme: Baksha | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 3245 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-May-2023 | Actual Date of Completion (Capex): 14-May-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X200 | 18.05/58.54 | Baksha | 25.787856 | 82.57445 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-15HP | 700/50 | Baksha | 25.787856 | 82.57445 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200KL-16M | Baksha | 25.787794 | 82.574337 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 0.755 | |
| 2 | HDPE PIPE PN-6 | 140 | 0.224 | |
| 3 | HDPE PIPE PN-6 | 110 | 0.789 | |
| 4 | HDPE PIPE PN-6 | 90 | 1.167 | |
| 5 | HDPE PIPE PN-6 | 75 | 1.177 | |
| 6 | HDPE PIPE PN-6 | 63 | 17.445 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 480 |