Project Completion Certificate (Ground Water)
Scheme ID: 8361251 Name of Scheme: Baijpur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2802 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Jun-2023 Actual Date of Completion (Capex): 30-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.04/128.31 Baijpur 27.421778 82.101606
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 600 LPM Discharge/ 37 mtr Head Baijpur 27.421778 82.101606
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/10 Mtr Baijpur 27.421778 82.101606
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 1.86
2 HDPE 140 0.019
3 HDPE 110 2.392
4 HDPE 90 0.341
5 HDPE 75 0.817
6 HDPE 63 4.668
HSC Connection
Sno. Total Nos.
1 416
Other Details
1.88
0.00
2.42
30-Aug-2024
30-Aug-2024