Project Completion Certificate (Ground Water)
Scheme ID: 8361845 Name of Scheme: AKBARPUR No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2845 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 27-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.11 M / 118.75 M Akbarpur 26.509637 79.326514
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (40.3 M3/Hr.) / 40 M Akbarpur 26.509637 79.326514
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 18 M Akbarpur 26.509714 79.326414
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.493
2 HDPE 75 0.162
3 HDPE 90 0.482
4 HDPE 110 1.356
5 HDPE 140 1.156
6 HDPE 160 0.186
HSC Connection
Sno. Total Nos.
1 601
Other Details
2.95
2.40
2.40
04-Sep-2024
05-Sep-2024