Project Completion Certificate (Ground Water)
Scheme ID: 8361893 Name of Scheme: SHIVPUR No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3960 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 01-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.36 M / 64.17 M Shivpur 26.768382* 79.495804*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (53.5 M3/Hr.) / 42 M Shivpur 26.768382* 79.495804*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 12 M Shivpur 26.768458* 79.495918*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.239
2 HDPE 75 1.297
3 HDPE 90 4.203
4 HDPE 110 2.045
5 HDPE 140 1.508
6 HDPE 160 0.016
HSC Connection
Sno. Total Nos.
1 753
Other Details
3.57
2.87
2.87
14-Sep-2023
15-Sep-2023