| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8361966 | Name of Scheme: PATA | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4755 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Sep-2022 | Actual Date of Completion (Capex): 01-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27.06 Mtr./157.67 Mtr. | Pata | 26.657851* | 79.485124* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (54.6 M3/Hr.) /55 Mtr. | Pata | 26.657851* | 79.485124* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 Kl/ 16Mtr. | Pata | 26.656496* | 79.485124* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.146 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.041 | |
| 2 | HDPE | 75 | 2.058 | |
| 3 | HDPE | 90 | 0.377 | |
| 4 | HDPE | 110 | 0.591 | |
| 5 | HDPE | 140 | 0.627 | |
| 6 | HDPE | 160 | 0.295 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 692 |