Project Completion Certificate (Ground Water)
Scheme ID: 8361966 Name of Scheme: PATA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4755 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 01-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.06 Mtr./157.67 Mtr. Pata 26.657851* 79.485124*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (54.6 M3/Hr.) /55 Mtr. Pata 26.657851* 79.485124*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 Kl/ 16Mtr. Pata 26.656496* 79.485124*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.146
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.041
2 HDPE 75 2.058
3 HDPE 90 0.377
4 HDPE 110 0.591
5 HDPE 140 0.627
6 HDPE 160 0.295
HSC Connection
Sno. Total Nos.
1 692
Other Details
3.17
3.28
3.28
24-Sep-2023
25-Sep-2023