| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8362100 | Name of Scheme: DONDAPUR | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2435 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Oct-2021 | Actual Date of Completion (Capex): 20-May-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12.07 M/89.84 M | Dondapur | 26.795803* | 79.550917* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (36.6 M3/Hr.) / 46 M | Dondapur | 26.795803* | 79.550917* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 16 M | Dondapur | 26.796086* | 79.551321* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.0015 | |
| 2 | D.I. | 100 | 0.0865 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.016 | |
| 2 | HDPE | 75 | 0.217 | |
| 3 | HDPE | 90 | 0.231 | |
| 4 | HDPE | 110 | 1.427 | |
| 5 | HDPE | 140 | 0.059 | |
| 6 | HDPE | 160 | 0.019 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 408 |