Project Completion Certificate (Ground Water)
Scheme ID: 8362630 Name of Scheme: TIKAMPUR No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3145 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 25-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24 M/ 154.5 M Tikampur 26.628043* 79.432994*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (44.0 M3/Hr.) / 46 M Tikampur 26.628043* 79.432994*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL/16M Tikampur 26.628083* 79.433191*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.0135
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.111
2 HDPE 140 3.422
HSC Connection
Sno. Total Nos.
1 405
Other Details
2.22
2.22
2.23
31-Jan-2025
01-Feb-2025