Project Completion Certificate (Ground Water)
Scheme ID: 8362778 Name of Scheme: PILANA VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3164 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 12-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 15.0 MTR/135.0MTR PILANA 29.19587 78.27668
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 650LMP/40MTR PILANA 29.19587 78.27668
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/16MTR PILANA 29.196115 78.276687
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 160 2.449
2 HDPE PIPE PN-6 CLASS PE-100 90 0.146
3 HDPE PIPE PN-6 CLASS PE-100 75 0.481
4 HDPE PIPE PN-6 CLASS PE-100 63 10.298
HSC Connection
Sno. Total Nos.
1 575
Other Details
3.67
3.67
3.67
18-Jun-2024
19-Jun-2024