Project Completion Certificate (Ground Water)
Scheme ID: 8386595 Name of Scheme: Parsauni No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3510 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 21-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/153.82 Parsauni 26.61 83.60
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 48/42 Parsauni 26.61 83.60
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/14 Parsauni 26.61 83.60
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.020 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.238 Laying Completed
2 HDPE 75 4.118 Laying Completed
3 HDPE 90 0.774 Laying Completed
4 HDPE 110 1.237 Laying Completed
5 HDPE 140 0.436 Laying Completed
6 HDPE 180 0.730 Laying Completed
HSC Connection
Sno. Total Nos.
1 639
Other Details
2.58
0.00
2.81
20-Aug-2024
01-Sep-2026