Project Completion Certificate (Ground Water)
Scheme ID: 8386625 Name of Scheme: BASDEELA Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1630 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 01-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16.98/105.84 Basdeela 26.6492 83.2398
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 30/40 Basdeela 26.6492 83.2398
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 75/14 Basdeela 26.6492 83.2398
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.02 Laying Completed
2 HDPE 75 0.08 Laying Completed
3 HDPE 90 0.89 Laying Completed
HSC Connection
Sno. Total Nos.
Other Details
1.74
0.00
1.73
07-Jul-2026
10-Jul-2026