| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8386640 | Name of Scheme: MAHIMATH GP WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2520 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Feb-2023 | Actual Date of Completion (Capex): 30-Apr-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30/132.7 | Mahimath | 26..6852 | 83.4160 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 60/43 | Mahimath | 26..6852 | 83.4160 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 150/16 | Mahimath | 26..6852 | 83.4160 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.011 | Laying Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.889 | Laying Completed |
| 2 | HDPE | 75 | 0.411 | Laying Completed |
| 3 | HDPE | 90 | 0.3 | Laying Completed |
| 4 | HDPE | 110 | 0.125 | Laying Completed |
| 5 | HDPE | 140 | 0.21 | Laying Completed |
| 6 | HDPE | 160 | 1.007 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 435 |