Scheme ID: 8386696 Name of Scheme: Bharatpur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 3640 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 10-Sep-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27/165 Bharatpur 26.64 83.56
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 42/40 Bharatpur 26.64 83.56
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/16 Bharatpur 26.64 83.56
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.02 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 20.36 Laying Completed
2 HDPE 75 1.30 Laying Completed
3 HDPE 140 1.04 Laying Completed
4 HDPE 180 0.1 Laying Completed
HSC Connection
Sno. Total Nos.
1 624
Other Details
3.22
0.00
3.21
19-Jul-2025
01-Oct-2026