Project Completion Certificate (Ground Water)
Scheme ID: 8388585 Name of Scheme: BIRAHIMPUR No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 4560 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 11-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05 M/ 123.84 M BIRAHIMPUR 27.253885 80.083287
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.030 M³ per Min /45Mtr BIRAHIMPUR 27.253885 80.083287
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 16 Mtr BIRAHIMPUR 27.254039 80.083387
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.01864
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.3358
2 HDPE Pipe PN-6, Class PE-100 75 3.0854
3 HDPE Pipe PN-6, Class PE-100 90 1.5826
4 HDPE Pipe PN-6, Class PE-100 110 3.943
5 HDPE Pipe PN-6, Class PE-100 125 1.146
6 HDPE Pipe PN-6, Class PE-100 140 0.506
7 HDPE Pipe PN-6, Class PE-100 160 0.7938
8 HDPE Pipe PN-6, Class PE-100 180 0.682
9 HDPE Pipe PN-6, Class PE-100 200 0.316
HSC Connection
Sno. Total Nos.
1 831
Other Details
3.63
0.00
3.37
10-Aug-2023
25-Dec-2024