Scheme ID: 8388622 Name of Scheme: Dhamera Nara No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1765 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 04-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21 M/109.37 M Dhamera Nara 28.326295 77.793858
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650 LPM / 46.60 M Dhamera Nara 28.326295 77.793858
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/12 M Dhamera Nara 28.326355 77.794013
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 19
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.49
2 HDPE 75 0.20
3 HDPE 90 0.027
4 HDPE 110 0.22
5 HDPE 140 0.63
6 HDPE 160 1.02
HSC Connection
Sno. Total Nos.
1 535
Other Details
2.23
2.12
2.14
31-Dec-2025
01-Jan-2026