Project Completion Certificate (Ground Water)
Scheme ID: 8388711 Name of Scheme: JABTA NAGAR DHAKIA MUSSEPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1970 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Mar-2026 Actual Date of Completion (Capex): 01-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 9.41
2 HDPE PIPE PN -6: CLASS PE -100 75 0.22
3 HDPE PIPE PN -6: CLASS PE -100 90 0.94
4 HDPE PIPE PN -6: CLASS PE -100 110 1.09
5 HDPE PIPE PN -6: CLASS PE -100 125 0.93
6 HDPE PIPE PN -6: CLASS PE -100 140 0.09
7 HDPE PIPE PN -6: CLASS PE -100 160 0.02
HSC Connection
Sno. Total Nos.
Other Details
2.04
2.04
2.01
31-Jul-2025
01-Aug-2025