Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in


Scheme Details

S.No. District Name Agency Name Scheme Id Scheme Name Estimated Cost Expenditure Automation Integration Status
1 Fatehpur Power Mech Projects Ltd 20085893 BASAWAN KHERA 225.60 87.25 Not Integrated

Scheme Physical Progress

Village Covered T/W OHT Solar Plant Electric Distribution (Line Laying in meter.)
Required Boring Done Air Compressor done O. P. Unit done Required Work Started Work Completed Required Procured (KW) Work status Required Transformer Procured Work status Total Length Length Laid
2 1 1 1 1 1 0 0 20 20 Yes 0 NA No 7605.00 7500.00

Scheme Assigned Villages

Sno. District Name Bolck Panchayat Village ID Village Name House Holds FHTC FHTC % Har Gar Jal Certified
1 Fatehpur Malwan Basawan Khera 427459 Basawan Khera 236 236 100 Har Gar Jal Not Certified
2 Fatehpur Malwan Basawan Khera 427460 Habibpur 117 117 100 Har Gar Jal Not Certified