Status Of NCs & Compliances

S.No.
District
TKC Total NCs reported Complainces Submitted By TKCs % Of Compliance Submitted No. of bills processed without compliances
(J)
Remarks(Only Critical in few words)
Critical
(A)
Major
(B)
Minor
(C )
Total
D = A+B+C
Critical
(E )
Major
(F)
Minor
(G)
Total
H=E+F+G
I = H*100/D
Total 52629 247828 15526 315983 42878 194953 12251 250082 79.14 8664
1 Varanasi
Larsen & Toubro Ltd 3542 25724 1224 30490 3204 22188 1055 26447 86.74 0 1-Cracks observed in Boundary wall. 2-Road Restoration work was not done properly at some places. 3-Joints of brickwork are not filled properly 4-Mortar used for the Brick work was not as per DPR and specifications.
2 Kushi Nagar
NCC Ltd. 2722 17556 229 20507 2716 17424 210 20350 99.23 621 1. A full-depth vertical crack has been developed in the boundary wall. 2.The hydro level transmitter is currently installed without a corresponding display or monitoring interface. Installation of the display unit is required to enable real-time level tracking and ensure operational visibility. 3.The solar panel has been found damaged and does not comply with electrical safety regulations, Damage
3 Prayagraj
Larsen & Toubro Ltd 2393 13971 481 16845 2246 13498 448 16192 96.12 0 Leakage has been found from the Liner of the OHTs
GAJA - GAIPL JV 516 695 3 1214 492 626 3 1121 92.34 0 Misalignment has found in the column of the OHT
VPRPL 313 746 14 1073 271 564 8 843 78.56 0 Seepage has been found from the OHT
4 Gorakhpur
NCC Ltd. 956 14643 663 16262 714 10460 498 11672 71.77 2627 1. Crack has been observed in the boundary wall. 6. Crack has been observed in the pump house floor. 7. Paint quality is not good of boundary wall. 8. Campus approach road has been settled down. 9. Recharge pit chamber has been found damaged. 10. Honeycomb has been found in OHT TB-2.
Rithwik-Koya (JV) 347 5336 217 5900 262 4464 145 4871 82.56 320 1. HDPE pipe found exposed condition end cap is not provided. 2.Boundary wall coping has been observed damage. 3. Lightning arrester has not been installed on the OHT. 4. The painting work on the OHT has not been done properly. 5. Crack has been found in the bpundary wall.
5 Ghazipur
VSA 3305 6374 73 9752 1770 2130 17 3917 40.17 140 "1-Rusted steel used in ground beam work 2-Honeycombing is found in the Ring/Tie beam , Columns of the OHT. 3-Rusted bars are using in the construction of OHT foundation. 4-Cracks are found in the slab of the pump house. 5-Cracks are found in the boundary wall."
Larsen & Toubro Ltd 2961 5635 249 8845 2219 4057 215 6491 73.39 169 "1-The DPC layer of boundary wall is damaged 2- Honeycombing is found on the coping of the boundary wall 3- Honeycombing is found on the roof of the pump house."
HFCL- JWIL (JV) 1806 4166 100 6072 1601 3554 99 5254 86.53 0 "1-Width of the trench observed is 200mm at the top of the trench whereas as per DPR the width should be at least 600mm+ of pipe. 2-Quality of sand, 10mm, 20mm Aggregate not satisfactory 3- 75mm HDPE Pipe found laid in damage condition. 4-Depth of the trench is found 600mm at the top of the 63mm HDPE Pipe , whereas as per DPR the Depth should be at least 1000mm+ Dia of pipe. 5-MDPE pipe (20mm) f
6 Deoria
LC INFRA 1081 7752 69 8902 831 5674 50 6555 73.64 1948 1.-Cracks has been observed in wall of pump house.,2.Crack has been observed on the boundary wall.,3.Steel is visible in lintel beam of pump house.
Gayatri Projects LTD 986 6999 32 8017 985 6023 25 7033 87.73 1287 1.Crack has been observed on the boundary wall.,2.Steel is visible in coping of boundary wall.
Rithwik-Koya (JV) 201 2040 21 2262 159 1515 11 1685 74.49 101 1.3rd brace column finishing not done properly.,2.Honeycomb has been observed on the 6th lift staircase of OHT.
UNIVERSAL MEP 177 1045 8 1230 175 998 7 1180 95.93 30 1.Crack has been observed on the boundary wall.2.Crack has been observed on coping of boundary wall.
7 Jaunpur
AFCONS 2793 5351 178 8322 2504 4922 150 7576 91.04 636 Honeycomb found in columns of OHT and Crack observed in Boundary wall, Har ghar Jal certification slow
Welspun Kaveri Infraprojects JV 2032 5658 180 7870 1880 5108 164 7152 90.88 543 Honeycomb found in columns of OHT and Crack observed in Boundary wall, Har ghar Jal certification slow and Road restoration work slow
8 Azamgarh
LC INFRA 1725 6158 276 8159 1608 4978 192 6778 83.07 0 1.) Bricks are not being used as the approved BOQ i.e of 1st class for boundary wall, pump house & staff quarter works. 2.) Construction materials such as cement, sand, aggregate, bricks and shuttering materials were not found of satisfactory quality and standards. 3) honeycomb was observed in major area of the raft foundation.
M/s Sudhakara Infratech Pvt. Ltd 1635 4658 115 6408 1175 3239 41 4455 69.52 0 1.) Bricks are not being used as the approved BOQ i.e of 1st class for boundary wall, pump house & staff quarter works. 2.)Rusted steel bars were used for slab and OHT work which Is not as per IS specification's.
GA INFRA - BABA (JV) 409 1354 53 1816 141 464 13 618 34.03 0 1.) Backfilling of trenches after pipe laying is not being done layer-wise which could cause major accidents. 2.)The dia of the reinforcement bar was used 6 mm instead of 8mm in pump house slab beam. 3.)Material testing are not being done as per the norms due to which inadequate materials are used at site and could cause major failure of structure.
VIKRAN-VPRPL (JV) 380 863 120 1363 288 412 35 735 53.93 0 Curing is not being done properly hence structure is not able to achieve its optimum strength.
GAJA - SGIPL (JV) 221 1098 23 1342 140 790 5 935 69.67 0 1.) The oversized gravel was used at site for raft foundation. 2.) The spacing of the Shear stirrups were not provided properly In column and Brace Beam.
SIEPL – BRCCPL (JV) / SKYLARK 221 527 84 832 93 228 15 336 40.38 0 Proper layer wise compaction is not being performed which causes depression on road, resulting accidents
ECO PROTECTION ENGINEER 181 396 3 580 166 374 0 540 93.10 0 The depth of the trench was found 700 mm at many locations whereas as per IS standard it should be 1 meter+dia of pipe.
9 Maharajganj
JMC - Lakshmi (JV) 660 7251 15 7926 580 6195 14 6789 85.65 0 Leakage has been found in OHT Bottom Dome. Honeycombing found in OHT 3rd flight staircase Cantilever beam.
Rithwik-Koya (JV) 419 3626 7 4052 302 2571 3 2876 70.98 0 The zinc OHT liner is popping out under the sheet near the balcony. Additional reinforcement not available for further casting of the OHT column.
10 Chandauli
VSA 1029 6330 255 7614 1018 6197 251 7466 98.06 0 "1-10mm,20mm aggregate found failed during sieve analasys test 2-Depth of 140mm dia HDPE Pipe found 570mm whereas as per the DPR ,pipe should be laid at least 1.0m+Dia 3-100 percent old brick used for BOE road restoration work as per DPR it should be 50 percent old and 50 percent new Brick should be used for restoration work 4-Hand concrete mixer used for concrete mixing Instead of PLC based weigh
ION EXCHANGE 675 6166 78 6919 635 5638 71 6344 91.69 0 "1-10mm,20mm aggregate found failed during sieve analasys test 2-Depth of 140mm dia HDPE Pipe found 570mm whereas as per the DPR ,pipe should be laid at least 1.0m+Dia 3-100 percent old brick used for BOE road restoration work as per DPR it should be 50 percent old and 50 percent new Brick should be used for restoration work 4-Hand concrete mixer used for concrete mixing Instead of PLC based weigh
GA INFRA - BABA (JV) 258 3514 78 3850 252 3366 72 3690 95.84 0 "1-Hand concrete mixer is being used for concrete mixing instead of weightbatch concrete mixer. 2-Dirty water used for mixing of concreting, which is against clause 4.6 of IS;2250 3-Honeycomb observed in Pump house ( Chajja) 4-Rusted reinforcement use in pump house slab 5-100 percent old brick used for BOE road restoration work as per DPR it should be 50 percent old and 50 percent new brick for re
HFCL- JWIL (JV) 168 1523 23 1714 159 1358 21 1538 89.73 0 "1-Hand concrete mixer used for concrete mixing Instead of PLC based weighbatch concrete mixer. 2-Depth found 800mm found for 63mm Dia HDPE Pipe laying as per DPR it should be 1000mm+Dia 3-Second class bricks are available at site, whereas per the DPR 1st class bricks should be used. 4-Curing of concrete of boundary wall coping casting work not done after de-shuttering. 5-MDPE pipe found above the
East India Udhyog- Kaveri JV 17 451 1 469 16 353 1 370 78.89 0 Road Restoration work is pending at site .
11 Fatehpur
Gayatri Projects LTD 342 6943 303 7588 162 2696 80 2938 38.72 0 The earthing work of pump plant has not been done.
Power Mech Projects Ltd 854 5549 216 6619 540 3198 115 3853 58.21 0 Hard barricading and sign boards have not been used at site.
GA INFRA - BABA (JV) 162 1017 35 1214 106 487 4 597 49.18 0 Poor lighting arrangement has been found in the storage area.
12 Mau
LC INFRA 738 5179 149 6066 595 2345 108 3048 50.25 0 1.) Severe cracks were observed in the boundary wall due to lack of curing work 2.)Multiple lapping is provided at a single section of the beam/raft which could reduce the strength of structure at those locations.
GA INFRA-VPL 429 4328 17 4774 221 2384 14 2619 54.86 0 1.)End cap found open due to which insects are entering through the inlet of the pipe, it may cause various diseases in supplied water. 2.)Soil compaction of trenches after pipe laying is not being done layer-wise which could cause major accidents.
KLSR - RAYS (JV) 75 1792 16 1883 56 690 2 748 39.72 0 1.) Open trench was found, after laying HDPE pipe soil back filling was not done it's more than 3days; which may cause accidents. 2.) Dent was found over the screen pipe which may leads to collapse of assembly system.
13 Kaushambi
GA INFRA - BABA (JV) 742 4433 302 5477 392 2459 204 3055 55.78 0 No cut out has been made at the slab of the oht for inlet and outlet pipe. As hammering in slab should be avoided to counter strength reduction.
JMC - Lakshmi (JV) 616 3472 209 4297 518 2924 175 3617 84.18 0 Honeycomb has been observed at the outer face of conical wall . Conical wall of the ESR has poorly constructed.
14 Pratapgarh
JMC - Lakshmi (JV) 943 4118 206 5267 912 3753 193 4858 92.23 0 The riser of 1st flight stair is found 200 mm at site while it should be 165mm as per drawing. Cracks have been started developing at several places in the boundary wall.
Power Mech Projects Ltd 1475 3554 62 5091 1460 2914 32 4406 86.54 0 Mud has been accumulated inside the water recharge chamber. The bore cap has not been fitted in the tube well, due to which bricks and stones have fallen into it, which is very difficult to remove and the bore well may collapse. The bore cap has not been fitted in the tube well, due to which bricks and stones have fallen into it, which is very difficult to remove and the bore well may collapse.
15 Mirzapur
GA INFRA 1044 3250 125 4419 1044 3250 125 4419 100.00 25 1 - Wall of staff quater found damaged., 2 - S.valve found damaged 3 -Plinth protection of staff quater found damaged. 4 -·Boundary wall found damaged..
NCC Ltd. 390 3127 270 3787 374 3127 270 3771 99.58 62 1 - Depth of HDPE Pipe is 750 MM., 2 -·Crack has been observed in ladder of MBR., 3 - Water logging in ESR campus, 4-Boundary wall collapsed, 5 -Leakage has been found due to not proper pipe fittings
Megha 721 2745 81 3547 448 2118 72 2638 74.37 49 1 - Many Leakage/seepage points have been observed in the CWR tank. , 2 - Water has accumulated near the ESR structure , 3 - Water logging on the chamber floor – Stagnant water was found inside the pump house, which poses a risk of electrical hazards and may cause damage to equipment.
Ramky baba 423 2077 153 2653 38 213 25 276 10.40 32 1 - Significant water stagnation observed around the rcc pedestal of the OHT 2 - The adjacent soil appears soft ,damp,and partialy eroded. 3- Signs of algae formation and water logging persist despite multiple site visits
GVPR 172 1397 49 1618 67 560 26 653 40.36 20 1 - Leakage/seepage found in ESR bottom dome. 2 -The level of the stairs does not seem to be correct, the stairs appear to be tilted to one side.
Multiurban 50 263 10 323 50 263 10 323 100.00 19        The Overhead Tank (OHT) campus has not been properly developed, with visible neglect in landscaping and basic infrastructure.
16 Sant Ravidas Nagar
Welspun Kaveri Infraprojects JV 1150 2933 267 4350 980 2573 175 3728 85.70 0
GA INFRA - BABA (JV) 1028 2226 194 3448 1010 2180 184 3374 97.85 0
17 Hardoi
NCC Ltd. 1329 1616 1313 4258 996 1279 1165 3440 80.79 0 1)Major cracks seen on boundary wall. 2)Pea gravel not stacked properly at site. 3)FHTC installed outside the house. 3) Disinfection of pipe not done 4) Lifting appliances, lifting gears and Compressor was not inspected by competent agency 5) Test certificate scaffolding material not submitted.6) Nonstandard scaffolding used at site.7) Non-standard DG used at site.7) Quality issues during OHT work
18 Sonbhadra
VPRPL 165 2567 98 2830 165 2284 68 2517 88.94 0
NCC Ltd. 109 1920 23 2052 109 1745 20 1874 91.33 0
Larsen & Toubro Ltd 47 1802 62 1911 47 1455 43 1545 80.85 0
GVPR 119 1260 40 1419 119 1054 23 1196 84.28 0
Jain Const. 9 176 14 199 9 176 14 199 100.00 0
19 Lucknow
NCC Ltd. 202 1679 553 2434 88 820 553 1461 60.02 0
20 Ballia
GAJA - GAIPL JV 253 1495 6 1754 239 1365 5 1609 91.73 0 1- Compaction not done after backfilling .pipe laying work is completed, trench is backfilled haphazardly without any proper layering , watering and Compaction which is not as per clause no-8.1.2 of Indian Standard 7634:2012 (part-2) 2. Depth of the trench observed is 470mm at the top of the 63mm HDPE Pipe whereas as per DPR the Depth should be at least 1000mm+ of pipe
Larsen & Toubro Ltd 426 1061 10 1497 420 962 10 1392 92.99 0 1.)Soil compaction of trenches after pipe laying is not being done layer-wise which could cause major accidents.Proper finishing not found of OHT Stair .2.Curing not properly done 3. Trench has been found settled, After pipe laying work compaction must be done in layer wise using compactor.
Eagle Infra- Sudhakara Infra JV 265 779 10 1054 255 685 10 950 90.13 0 1.Soil compaction of trenches after pipe laying is not being done layer-wise which could cause major accidents..2.Curing not properly done 3.After pipe laying work compaction must be done in layer wise using compactor.
21 Lakhimpur Kheri
NCC Ltd. 393 733 121 1247 129 532 90 751 60.22 0 1- Grouting work not completed in ZnAl tank, 2- Major honeycombing observed in OHT.
Vindhya-GAJA (JV) 201 379 91 671 71 221 61 353 52.61 0 1- Honeycombing found in OHT column & brace beam, 2- Poor quality of workmanship in oht work.
22 Lalitpur
M/s Sudhakara Infratech Pvt. Ltd 67 55 829 951 67 55 741 863 90.75 0
JMC-JWIL (JV) 48 66 413 527 48 66 344 458 86.91 0
DARA ENGINEERING 45 79 348 472 45 79 302 426 90.25 0
Banko Ganga 5 10 85 100 5 10 74 89 89.00 0
Brija Banco Pvt. Ltd 10 18 52 80 10 18 31 59 73.75 0
23 Raebareli
NCC Ltd. 47 428 78 553 44 428 78 550 99.46 0 Honey combing found in OHT, Leakage observed in OHT
Vindhya-GAJA (JV) 36 211 20 267 26 195 20 241 90.26 0 Poor quality of workmanship in OHT work, Leakage found in pipeline, Honey combing found in OHT.
24 Basti
Megha 117 181 188 486 92 106 117 315 64.81 0
JAKSON - VISHVARAJ (JV) 11 35 24 70 6 29 20 55 78.57 0
VSA 6 11 14 31 6 10 12 28 90.32 0
25 Jhansi
BGCCPL-Ramky (JV) 29 140 303 472 29 102 196 327 69.28 0
NCC Ltd. 26 93 295 414 26 93 269 388 93.72 0
Indian Hume Pipe 16 40 65 121 16 40 56 112 92.56 0
DARA ENGINEERING 19 31 62 112 19 31 58 108 96.43 0
Unipro 20 28 50 98 20 28 48 96 97.96 0
26 Saharanpur
GA INFRA - BABA (JV) 88 248 17 353 61 119 16 196 55.52 0 Poor Quality work OHT 3rd brace beam & column not plumb. Without complete staircase work & plumb of brace beam Inappropriate size of staircase Poor Quality work OHT column found honeycomb
NKG-PRIMUS (JV) 9 117 6 132 6 70 3 79 59.85 0 Poor quality construction work pump house. CC road reinstatement poor workmanship.
Gayatri Projects LTD 10 117 2 129 6 23 0 29 22.48 0 Poor quality construction work pump house. CC road reinstatement poor workmanship.
27 Sultanpur
Vindhya-GAJA (JV) 75 127 134 336 59 57 70 186 55.36 0
Gayatri Projects LTD 19 19 18 56 13 10 14 37 66.07 0
UNIVERSAL MEP 13 11 13 37 13 11 13 37 100.00 0
28 Sitapur
NCC Ltd. 317 0 0 317 18 0 0 18 5.68 0
Larsen & Toubro Ltd 0 46 110 156 0 24 60 84 53.85 0
29 Hathras
BGCCPL-Ramky (JV) 43 84 184 311 31 60 152 243 78.14 0
ION EXCHANGE 11 21 14 46 10 19 14 43 93.48 0 Work done without RFI & Reinstatement work not as per standard specification
30 Kasganj
ION EXCHANGE 51 156 72 279 35 128 54 217 77.78 0
PNC-SPML-JV 48 145 71 264 35 128 54 217 82.20 0
31 Muzaffarnagar
JMC - Lakshmi (JV) 149 108 14 271 89 41 2 132 48.71 0 -
NKG-PRIMUS (JV) 62 26 3 91 25 1 0 26 28.57 0 -
Gayatri Projects LTD 2 4 0 6 2 4 0 6 100.00 0 -
32 Firozabad
Larsen & Toubro Ltd 5 251 7 263 5 190 7 202 76.81 0
NCC Ltd. 0 153 1 154 0 149 1 150 97.40 0
33 Amroha
OMIL-JWIL (JV) 90 121 44 255 80 117 41 238 93.33 0 1) Poor Quality of Road Restoration 2) Corrosive steel is being used for OHT Construction 3) Poor Quality of Materials used for OHT Construction 4) PPE kit not available at site. 5) Poor Quality of Materials like sand and aggregate are being used for Construction of OHT 6) Zinc alum tank leakage
SPML Infra 85 91 36 212 61 84 31 176 83.02 0 1) Poor Quality of Road Restoration 2) Corrosive steel is being used for OHT Construction 3) Poor Quality of Materials used for OHT Construction 4) PPE kit not available at site. 5) RFI was Not raised and Technical staff not present at site 6) Poor Quality of Materials like sand and aggregate are being used for Construction of OHT
LC INFRA 3 2 3 8 2 2 3 7 87.50 0 1)Poor Quality of Road Restoration 2) Corrosive steel is being used for OHT Construction 3) Poor Quality of Materials used for OHT Construction 4) PPE kit not available at site. 5) RFI was Not raised and Technical staff not present at site 6) Poor Quality of Materials like sand and aggregate are being used for Construction of OHT
34 Siddharth Nagar
Megha 59 174 17 250 51 157 5 213 85.20 0
JAKSON - VISHVARAJ (JV) 55 14 69 138 45 12 57 114 82.61 0
VSA 29 85 7 121 23 85 1 109 90.08 0
35 Budaun
PNC-SPML-JV 75 149 8 232 75 149 8 232 100.00 0
NCC Ltd. 3 4 2 9 3 4 2 9 100.00 0
36 Jalaun
BGCCPL-Ramky (JV) 118 80 32 230 47 27 12 86 37.39 17 Revised drawings are still awaited for approval. Approved drawings are often not available at site of work.
GVPR 40 40 16 96 29 26 12 67 69.79 18 Revised drawings are still awaited for approval. Approved drawings are often not available at site of work.
37 Moradabad
LC INFRA 40 20 169 229 40 17 164 221 96.51 0 Cube Test Not Conduct Properly 07 days & 28 days , Approved Drawing Not Avaliable at site , Majorcracks seen on Boundary wall , PPE Kit Not avaliable at site & Saftey Negligence during dome casting.
NKG-PRIMUS (JV) 33 27 112 172 30 22 102 154 89.53 0 Staging Done Without Staircase , Brick Quality is not good & Saftey negligence during dome casting.
38 Agra
Megha 172 39 9 220 99 24 5 128 58.18 0
NCC-APCO JV 56 26 6 88 53 25 6 84 95.45 0
39 Kannauj
VSA 43 78 79 200 40 75 70 185 92.50 0 ZN-AL tank Fusion Not Done, Road Restoration Not Done, Column misalignment observed, honeycomb observed, work Without RFI
GVPR 19 59 40 118 18 56 32 106 89.83 0 Road Restoration Not Done, honeycomb observed, work Without RFI
40 Ambedkar Nagar
Vindhya-GAJA (JV) 56 130 3 189 56 86 2 144 76.19 0
Welspun Kaveri Infraprojects JV 11 30 2 43 10 16 2 28 65.12 0
41 Etah
Power Mech Projects Ltd 12 78 95 185 12 47 65 124 67.03 0
JMC - Lakshmi (JV) 4 25 26 55 3 16 18 37 67.27 0
ION EXCHANGE 0 4 0 4 0 3 0 3 75.00 0
42 Sant Kabeer Nagar
Megha 29 88 55 172 10 24 22 56 32.56 0 It was found at the site there is a large gap between the precast columns and the beam of OHT. Whereas gap should be 25 mm as per approved OHT Drawing. As per IS 15916 -2011, ±10 % tolerance allowed in precast components. Precast OHT Column dowel bars found 410 mm instead of 500 mm. Zinc Aluminum tank is corroded, Large gap between OHT slab and hold down bracket.
JAKSON - VISHVARAJ (JV) 22 74 61 157 20 23 13 56 35.67 0 Lapping in TB2 beam is not done as per specification whereas it should be 49D in M-25 Grade of concrete as per approved drawing. Alignment of beam is not as per drawing and design.
VISHVARAJ 16 43 45 104 15 20 7 42 40.38 0 Not proper finishing work of OHT column and brace , patching found at many places . Column not in an alighnment. At joints of column and brace lots of honey comb found . Column casting done without using plumb bob.OHT column above third brace is tilt.
43 Kanpur Nagar
Vindhya-GAJA (JV) 74 35 52 161 71 35 52 158 98.14 0
VSA 28 21 34 83 23 21 34 78 93.98 0
44 Aligarh
PNC-SPML-JV 15 118 9 142 15 114 9 138 97.18 0
JMC - Lakshmi (JV) 12 85 2 99 12 84 1 97 97.98 0
ION EXCHANGE 12 51 14 77 12 48 14 74 96.10 0
45 Bareilly
NCC Ltd. 42 60 36 138 38 59 36 133 96.38 0 Slab casting done without permission, and columns above TB-3 without permission of UPJN and TPIA
46 Bahraich
PNC-SPML-JV 44 76 18 138 44 70 16 130 94.20 0 1. Piling work is being done without approval of Methodology . 2. As build drawing not submitted to UPJN and TPI also
GA INFRA-VPL 9 14 8 31 5 12 8 25 80.65 0 HDD Method is not implementing in possible site locations 2. Lack of proper road restoration works. 3. Lack of manpower, physical work progress is very slow. 4. As build drawing not submitted to UPJN office and to TPI also.
47 Shamli
JMC - Lakshmi (JV) 54 70 9 133 30 12 6 48 36.09 0
Gayatri Projects LTD 2 4 2 8 2 0 0 2 25.00 0
48 Barabanki
Megha 75 54 2 131 39 17 1 57 43.51 0
PNC-SPML-JV 53 50 2 105 43 25 1 69 65.71 0
Vindhya-GAJA (JV) 28 22 0 50 22 16 0 38 76.00 0
VSA 12 13 0 25 12 6 0 18 72.00 0
Gayatri Projects LTD 5 9 0 14 4 1 0 5 35.71 0
49 Farrukhabad
GVPR 33 54 39 126 21 38 15 74 58.73 0
Vindhya-GAJA (JV) 2 35 21 58 2 31 21 54 93.10 0
50 Gonda
KLSR - RAYS (JV) 54 40 27 121 35 18 13 66 54.55 0 Misalignment, Major Honeycomb, Road Restoration, Cube Test Fail and water supply without Chlorination. Cracks in Plinth protection and BW.
Larsen & Toubro Ltd 2 48 17 67 2 39 9 50 74.63 0 Road Restoration and water supply without chlorination.
51 Pilibhit
PNC-SPML-JV 27 30 60 117 27 30 60 117 100.00 0 all compliances have been submitted by the firm.
VISHVARAJ 11 16 49 76 11 16 49 76 100.00 0
52 Mainpuri
NCC Ltd. 25 62 19 106 16 54 17 87 82.08 0
53 Auraiya
GVPR 69 29 6 104 68 29 6 103 99.04 0
Indian Hume Pipe 9 14 3 26 9 13 3 25 96.15 0
54 Ayodhya
VSA 38 44 22 104 28 20 10 58 55.77 0
UNIVERSAL MEP 2 25 10 37 2 25 9 36 97.30 0
Vindhya-GAJA (JV) 8 15 7 30 5 12 5 22 73.33 0
Gayatri Projects LTD 5 14 4 23 5 13 4 22 95.65 0
55 Hamirpur
JWIL 5 4 86 95 5 4 86 95 100.00 0
PNC-SPML-JV 6 4 68 78 6 4 68 78 100.00 0
56 Etawah
Indian Hume Pipe 24 42 20 86 24 42 20 86 100.00 0
OMIL-JWIL (JV) 39 17 4 60 28 17 4 49 81.67 0
57 Sambhal
SPML Infra 20 30 35 85 16 10 15 41 48.24 0 Zinc-Alum tank,Location and position of nut bolt is not as per specification,Tampering of bolt, gap in zinc laum sheet and OHT slab is seen.Column beam misalignment. Honey comb
NKG-PRIMUS (JV) 15 30 38 83 12 11 13 36 43.37 0 Zinc-Alum tank, Location and position of nut bolt is not as per specification, Tampering of bolt, gap in zinc laum sheet and OHT slab is seen.honey comb,steel exposer.
LC INFRA 0 0 0 0 0 0 0 0 0.00 0
58 Banda
Larsen & Toubro Ltd 9 9 67 85 9 9 67 85 100.00 0
NCC Ltd. 9 11 29 49 9 11 29 49 100.00 0
59 Amethi
Vindhya-GAJA (JV) 19 33 29 81 19 21 14 54 66.67 0
Gayatri Projects LTD 14 24 28 66 14 13 12 39 59.09 0
Welspun Kaveri Infraprojects JV 11 13 20 44 11 10 16 37 84.09 0
60 Balrampur
Larsen & Toubro Ltd 13 30 32 75 10 27 30 67 89.33 0 Drinking Water is supplied without performing disinfection of distribution line, hydraulic structure. 2) Pump house finishing work is not proper. 3) Lot of road restoration work is pending from the agency and quality of road restoration is not as per standard. 4. As build drawing not submitted to UPJN and TPI.
Dara- Eco Protection (JV) 14 25 22 61 11 22 21 54 88.52 0 Plywood doors have been installed in 17 Gram Panchayats. 2) HDD Method is not implementing in possible site locations. 3. Hydrotesting, disinfection, and flushing of the pipeline not done before water supply. 4. As build drawing not submitted to UPJN and TPI.
61 Shahjahanpur
NCC Ltd. 18 29 25 72 18 27 22 67 93.06 0
62 Kanpur Dehat
VSA 27 18 23 68 26 18 23 67 98.53 0
GVPR 4 9 10 23 4 9 10 23 100.00 0
Indian Hume Pipe 5 5 10 20 5 5 10 20 100.00 0
Vindhya-GAJA (JV) 2 5 2 9 1 5 2 8 88.89 0
63 Mahoba
JMC-JWIL (JV) 13 27 24 64 13 27 24 64 100.00 0
SLC-SMC (JV) 7 16 12 35 7 15 12 34 97.14 0
Larsen & Toubro Ltd 6 14 12 32 6 14 12 32 100.00 0
N.K. Gupta & K.B. Gupta Contractors 6 10 8 24 6 10 8 24 100.00 0
64 Bulandshahr
JMC - Lakshmi (JV) 1 59 2 62 1 59 2 62 100.00 0
Welspun Kaveri Infraprojects JV 0 24 1 25 0 24 0 24 96.00 0
Power Mech Projects Ltd 2 10 1 13 2 10 1 13 100.00 0
65 Rampur
OMIL-JWIL (JV) 19 27 3 49 15 19 2 36 73.47 0 RFI was not raised. 2.Quality of material not as per specification.3. Safety norms not followed, approved drawing not at site.
NKG-PRIMUS (JV) 12 22 6 40 9 13 0 22 55.00 0 OHT construction, cube testing failure, CC road restoration done work without raised RFI, OHT column beam misalignment, staircase not as per drawing
LC INFRA 1 4 0 5 1 2 0 3 60.00 0 Brick Quality is not good 2.Poor workmanship3.Caution Tape not used 4. Safety belt not used during OHT heighted work 5.PPE kit not used.
SPML Infra 0 0 0 0 0 0 0 0 0.00 0
66 Bijnor
Vindhya-GAJA (JV) 23 6 19 48 22 4 15 41 85.42 0 un approved steel and cement,column alignment not in plumb,major honeycombs.
LC INFRA 7 3 4 14 7 2 4 13 92.86 0 column alignment not in plumb,major honeycombs,brace beam shuttering found bulge.
67 Chitrakoot
Larsen & Toubro Ltd 9 16 20 45 9 15 16 40 88.89 0
GVPR 5 6 21 32 5 3 16 24 75.00 0
68 Shravasti
Larsen & Toubro Ltd 13 18 13 44 11 15 13 39 88.64 0 1) Drinking Water is supplied without performing disinfection of distribution line, hydraulic structure. Many schemes HDPE Pipe distribution line is found open without providing end caps. 2. Site Order Book , Approved drawings are not available at site premise during execution. 3. As build drawing not submitted to UPJN and TPI.
GA INFRA-VPL 0 33 0 33 0 12 0 12 36.36 0 Cube fail -2 / Honeycomb -3 / Water logged -1 / Steel cut upto GL -1 / Steel rusted -5
69 Meerut
Power Mech Projects Ltd 3 32 2 37 3 32 1 36 97.30 0
70 Baghpat
LC INFRA 4 10 18 32 4 10 14 28 87.50 0
71 Hapur
LC INFRA 4 4 19 27 4 4 19 27 100.00 0
72 Mathura
NCC-APCO JV 9 11 0 20 6 10 0 16 80.00 0 3 NCR pending as critical and 1NCR as Major
73 Ghaziabad
LC INFRA 4 12 3 19 4 7 2 13 68.42 0
74 Gautam Buddha Nagar
LC INFRA 2 2 13 17 1 2 8 11 64.71 0