Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20098992 JHALA MIHIPURWA (VPL) PWS 20098992/01 No No No No Yes No No No No No No No No *Dimensional error in one of Brace beam not as per approved drawing.
2 20099013 TIKUAPARA SHIVPUR (VPL) PWS 20099013/01 No No No No Yes No Yes No No No No No No *Concrete pouring is being caried out directly on the ground. *Slump of concrete is not as desired and even slump cone is also not provided at site.
3 20099780 TAJA KHODAI CHITTAURA (VPL) PWS 20099780/01 Yes Yes No No No No No No No No No No No *Misalignment of column above 3rd brace and honeycomb in columns. *Honeycomb is OHT column.
4 20093210 GANIYAPUR TEJWAPUR (VPL) PWS 20093210/01 No No No No Yes No No No No No No No No *Regarding top ring beam has executed in deviation from the approved drawing.
5 20092705 MADHUBAN BALAHA (VPL) PWS 20092705/01 No No No No Yes No No No No No No No No Resolved *staircase waist slab thickness not as per approved drawing.
6 20093315 JAMNUHA NAUBASTA NAWABGANJ (VPL) MVS PWS 20093315/01 No No No No Yes No No No No No No No No Resolved *Deviation in brace beam, not constructed as per approved drawing.
7 20099020 ARGORWA (Bhak) MIHIPURWA (VPL) MVS PWS 20099020/01 No No No No No No Yes No No No No No No Resolved *In the ring beam, the hooks have not been provided as per the structural design requirements. All hooks have been placed in the same direction, which is structurally incorrect violates the basic reinforcement practices.
8 20093277 DHARAILA KAISARGANJ (VPL) MVS PWS 20093277/01 Yes Yes No Yes No No No No No No No No No Resolved Resolved Resolved *Honeycombing has been observed in the column. *Misalignment at the column-to-brace junction has occurred as a result of using improper shuttering during construction. *Due to the work being halted for over a year, the reinforcement in the column has developed rust.
9 20099798 BAKSHI PURA CHITTAURA (VPL) MVS PWS 20099798/01 Yes No No Yes No No No No No No No No No Resolved Resolved *Major Cracks are visible in the columns and beams. *Reinforcement bars are exposed for long time.
10 20093359 DULARPUR CHITAURA (VPL) PWS 20093359/01 Yes Yes No No Yes No Yes No No No No No No Resolved Resolved Resolved Resolved *improper shuttering has been used during casting, resulting in uneven surfaces and poor finishing. *Junction boxes have not been provided at the column-brace junctions, leading to poor alignment and substandard finishing in these areas. *The thickness of the staircase slab does not match the approved structural drawing, which may affect its strength and serviceability. *Honeycombing is visible at several columns, indicating inadequate concrete compaction. *Overall, the workmanship observed in the construction of the OHT is below acceptable standards.
11 20099003 HUSENIPURWA RISIA (VPL) PWS 20099003/01 Yes Yes No No No No Yes No No No No No No Resolved Resolved *The columns are vertically not aligned, deviating from the specified standards. *Improper use of shuttering resulted in the majors honeycombs in the structure. *The improper shuttering has led to alignment issues between the columns and brace beams.
12 20093285 KAHARAI KAISARGANJ (VPL) MVS PWS 20093285/01 Yes Yes No Yes Yes No No No No No No No No Resolved Resolved Resolved Resolved *Columns are not vertically aligned. *Rusting in exposed steel from column. *Major honeycombing observed in columns and beams
13 20099784 MADARIYA MIHIPURWA (VPL) PWS 20099784/01 No Yes No No No No No No No No No No No Resolved *The brace beam has been deformed.
14 20093244 PURE SHIV SAHYA VISHESWARGANJ (VPL) PWS 20093244/01 No No No Yes No No No No No No No No No Resolved *The work has been stopped since 8 months due to which the reinforcement bars were exposed and rusted.
15 20093336 RAJAPUR MAFI CHITAURA (VPL) MVS PWS 20093336/01 Yes No No No Yes No Yes No No No No No No Resolved Resolved Resolved *OHT Structure has not been constructed as per approved drawing. *Material quality used is not as per standard. *Major honeycombing observed in columns & Beams.
16 20098995 SEMRAHANA MIHIPURWA (VPL) PWS 20098995/01 Yes No No No Yes No Yes No No No No No No Resolved Resolved Resolved *Substandard materials are used in construction. *Major honeycombing observed in columns and beams due to improper use of shuttering & poor quality execution. *Overall, the workmanship observed in the construction of the OHT is below acceptable standards.
17 20093320 AMWA TETARPUR PHAKHARPUR (VPL) MVS PWS 20093320/01 No No Yes No Yes No No No No No No No No Resolved Resolved *Regarding poor surface finishing of OHT air voids seams at few places. *Cube test failed for the sample of 1st lift column above 3rd brace.
18 20098970 KATILIYA BHOOP SINGH CHITTAURA (VPL) PWS 20098970/01 No No Yes No No No No No No No No No No Resolved *Cube test failed for teh sample of 2nd flight of stair case.
19 20099007 MAJHAUBWA VISHESWARGANJ (VPL) PWS 20099007/01 No No No No Yes No Yes No No No No No No Resolved Resolved Brace steel lapping length is not as per IS standard. *Crank in column reinforcement bars has not been developed as per approved design and specification.
20 20099788 PARSA RAMPUR PHAKARPUR (VPL) PWS 20099788/01 No No No No Yes No Yes No No No No No No *Ring beam alignment not as per approved drawing, ring beam found in zig zig manner. *Column not casted as per approved drg , miss alignment in vertical column bars
21 20099808 GAURIYA & JOGANIYA MIHIPURWA (VPL) MVS PWS 20099808/01 Yes No No No Yes No Yes No No No No No No Resolved Resolved Resolved *Minor cracks observed at brace beam due to poor quality concreting. *Dimensional error in all Brace beam no as per approved drawing. *Minor honey comb at column due to poor compaction due to concreting.
22 20092791 CHILAULI JARWAL (VPL) PWS 20092791/01 No No Yes No No No No No No No No No No Resolved *28 days cube fail 4th brace beam.
23 20092772 GAUR JARWAL (VPL) PWS 20092772/01 No No Yes No No No No No No No No No No Resolved *OHT 6th flight stair case 28 days cube didn't achieve target mean strength.
24 20099015 SALARPUR CHITAURA (VPL) MVS PWS 20099015/01 No No Yes No No No No No No No No No No Resolved *OHt 8th flight 28 days cube not attain desired strength.
25 20093206 DHODHAYAL TEJWAPUR (VPL) PWS 20093206/01 No No Yes No No No No No No No No No No Resolved *OHT 28 days 1st brace beam cube fail.
26 20098989 SIDARKHA KAISARGANJ (VPL) PWS 20098989/01 No No No No No No Yes No No No No No No Resolved *cube is not filled at the time of casting
27 20099778 CHANDANPUR BALAHA (VPL) PWS 20099778/01 No No Yes No No No No No No No No No No Resolved *4th lift stair case 28 days cube fail.
28 20092931 BAMIYARI PAKHARPUR (VPL) PWS 20092931/01 No No No No Yes No Yes No No No No No No Resolved Resolved *No concrete test cubes were cast during concreting, indicating non-compliance with standard quality control procedures and very poor workmanship. *As per approved drawings, the staircase tread width is specified as 250 nrrn, whereas only 230 mm was found at site, which is a deviation from the approved design.
29 20099782 PAWAHI KAISARGANJ (VPL) PWS 20099782/01 No No No No Yes No No No No No No No No Resolved *3 column caste without cube fill, 10mm aggregate not available at site.
30 20099008 SHIVPUR BAIRAGI VISHESWARGANJ (VPL) PWS 20099008/01 No No No No Yes No No No No No No No No Resolved *regarding deviation in brace beam dimension from approved drawing.
31 20093332 BARAI BILASA CHITAURA (VPL) MVS PWS 20093332/01 No No Yes No No No No No No No No No No Resolved *Cube failed of 28 days of 1st lift column above 2nd brace
32 20099010 UCHWA PURAINA CHITTAURA (VPL) PWS 20099010/01 Yes No No No No No No No No No No No No Resolved *HONEYCOMB IS OBSERVED IN STAIRCASE SLAB .
33 20099005 KARNIYA RISIA (VPL) PWS 20099005/01 No No No No No No Yes No No No No No No Resolved *Few vertical columns steel is chopped at GL level.
34 20098948 NIBIYASHAH MOHAMMADPUR BALAHA (VPL) PWS 20098948/01 No No No No No No Yes No No No No No No Resolved *Few vertical columns steel chopped at GL level .
35 20098950 TULSIPUR BALAHA (VPL) PWS 20098950/01 No No No No No No Yes No No No No No No Resolved *Few vertical columns steel chopped at GL level .
36 20093234 UDHARANA SARAHDI VISHESWARGANJ (VPL) PWS 20093234/01 No No No Yes No No Yes No No No No No No Resolved Resolved *due to prolonged suspension of work , all reinforcement steel in the grade beam of the OHT structure has become rusted from continuous exposure without any protective covering. *Certain vertical reinforcement bars of the column have been cut and appear to have been stolen
37 20098996 PEERNASARUDDIN NAWABGANJ (VPL) PWS 20098996/01 No Yes No No No No No No No No No No No Resolved *Regarding misalignment in GL brace and minor honeycomb in column brace junctions.
38 20099787 BHAGWANPUR KURMIYANA MIHIPURWA (VPL) PWS 20099787/01 Yes Yes No No No No Yes No No No No No No Resolved Resolved Resolved *The shuttering at the column brace junction is improper. *There is misalignment in columns at junction points. *There are major honeycombing at beams and columns.
39 20101738 MOTIPUR MIHIPURWA (VPL) PWS 20101738/01 Yes Yes No No No No No No No No No No No Resolved *Honeycomb is observed in column and brace beam. *Column is not vertically aligned and section is not properly casted. *Center to center distance between two columns has 30-40 mm variation from drawing.
40 20101733 NAGAR CHITTAURA (VPL) PWS 20101733/01 No No No No No No Yes No No No No No No Resolved *1st staircase cantilever beam reinforcement cut from column.
41 20092859 MOHANAPUR GANGAPUR MIHIPURWA (VPL) PWS 20092859/01 No No No Yes No No No No No No No No No Resolved *Due to prolonged suspension of work, all reinforcement steel in the column of the OHT structure has become rusted from continuous exposure without any protective covering.
42 20093190 MANIKPUR BAGHAULI SHIVPUR (VPL) PWS 20093190/01 No No No Yes No No No No No No No No No Resolved *Regarding rusting of Beam steel at GL level beam .
43 20092866 AYODHYA GAON MIHIPURWA (VPL) PWS 20092866/01 Yes No No Yes Yes No Yes No No No No No No Resolved Resolved *Dimensional error in all Brace beam not as per approved drawing. *Rusted reinforcement steel found at full stagging possible due to long delay in casting. *Minor honeycomb is brace column junction due to poor compaction due to concreting.
44 20093179 PIPARI MAFI SHIVPUR (VPL) PWS 20093179/01 No Yes No No No No No No No No No No No Resolved *All column is not vertically aligned.
45 20099016 NAWAPATTI CHITAURA (VPL) MVS PWS 20099016/01 Yes Yes No No No No Yes No No No No No No Resolved *The improper shuttering has led to alignment issues between the columns and brace beams. *Brace beam from one column got settled due to improper vertically support to the brace beam bottom shuttering at the time of casting. *Major honeycombing observed in columns and beams due to improper use of shuttering & poor-quality execution.