| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20098992 | JHALA MIHIPURWA (VPL) PWS | 20098992/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Dimensional error in one of Brace beam not as per approved drawing. | |||||||||||||
| 2 | 20099013 | TIKUAPARA SHIVPUR (VPL) PWS | 20099013/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | *Concrete pouring is being caried out directly on the ground. *Slump of concrete is not as desired and even slump cone is also not provided at site. | |||||||||||||
| 3 | 20099780 | TAJA KHODAI CHITTAURA (VPL) PWS | 20099780/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | *Misalignment of column above 3rd brace and honeycomb in columns. *Honeycomb is OHT column. | |||||||||||||
| 4 | 20093210 | GANIYAPUR TEJWAPUR (VPL) PWS | 20093210/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Regarding top ring beam has executed in deviation from the approved drawing. | |||||||||||||
| 5 | 20092705 | MADHUBAN BALAHA (VPL) PWS | 20092705/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | *staircase waist slab thickness not as per approved drawing. | ||||||||||||
| 6 | 20093315 | JAMNUHA NAUBASTA NAWABGANJ (VPL) MVS PWS | 20093315/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | *Deviation in brace beam, not constructed as per approved drawing. | ||||||||||||
| 7 | 20099020 | ARGORWA (Bhak) MIHIPURWA (VPL) MVS PWS | 20099020/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *In the ring beam, the hooks have not been provided as per the structural design requirements. All hooks have been placed in the same direction, which is structurally incorrect violates the basic reinforcement practices. | ||||||||||||
| 8 | 20093277 | DHARAILA KAISARGANJ (VPL) MVS PWS | 20093277/01 | Yes | Yes | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | Resolved | *Honeycombing has been observed in the column. *Misalignment at the column-to-brace junction has occurred as a result of using improper shuttering during construction. *Due to the work being halted for over a year, the reinforcement in the column has developed rust. | ||||||||||
| 9 | 20099798 | BAKSHI PURA CHITTAURA (VPL) MVS PWS | 20099798/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | *Major Cracks are visible in the columns and beams. *Reinforcement bars are exposed for long time. | |||||||||||
| 10 | 20093359 | DULARPUR CHITAURA (VPL) PWS | 20093359/01 | Yes | Yes | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | Resolved | *improper shuttering has been used during casting, resulting in uneven surfaces and poor finishing. *Junction boxes have not been provided at the column-brace junctions, leading to poor alignment and substandard finishing in these areas. *The thickness of the staircase slab does not match the approved structural drawing, which may affect its strength and serviceability. *Honeycombing is visible at several columns, indicating inadequate concrete compaction. *Overall, the workmanship observed in the construction of the OHT is below acceptable standards. | |||||||||
| 11 | 20099003 | HUSENIPURWA RISIA (VPL) PWS | 20099003/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | *The columns are vertically not aligned, deviating from the specified standards. *Improper use of shuttering resulted in the majors honeycombs in the structure. *The improper shuttering has led to alignment issues between the columns and brace beams. | |||||||||||
| 12 | 20093285 | KAHARAI KAISARGANJ (VPL) MVS PWS | 20093285/01 | Yes | Yes | No | Yes | Yes | No | No | No | No | No | No | No | No | Resolved | Resolved | Resolved | Resolved | *Columns are not vertically aligned. *Rusting in exposed steel from column. *Major honeycombing observed in columns and beams | |||||||||
| 13 | 20099784 | MADARIYA MIHIPURWA (VPL) PWS | 20099784/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | *The brace beam has been deformed. | ||||||||||||
| 14 | 20093244 | PURE SHIV SAHYA VISHESWARGANJ (VPL) PWS | 20093244/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | *The work has been stopped since 8 months due to which the reinforcement bars were exposed and rusted. | ||||||||||||
| 15 | 20093336 | RAJAPUR MAFI CHITAURA (VPL) MVS PWS | 20093336/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | *OHT Structure has not been constructed as per approved drawing. *Material quality used is not as per standard. *Major honeycombing observed in columns & Beams. | ||||||||||
| 16 | 20098995 | SEMRAHANA MIHIPURWA (VPL) PWS | 20098995/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | *Substandard materials are used in construction. *Major honeycombing observed in columns and beams due to improper use of shuttering & poor quality execution. *Overall, the workmanship observed in the construction of the OHT is below acceptable standards. | ||||||||||
| 17 | 20093320 | AMWA TETARPUR PHAKHARPUR (VPL) MVS PWS | 20093320/01 | No | No | Yes | No | Yes | No | No | No | No | No | No | No | No | Resolved | Resolved | *Regarding poor surface finishing of OHT air voids seams at few places. *Cube test failed for the sample of 1st lift column above 3rd brace. | |||||||||||
| 18 | 20098970 | KATILIYA BHOOP SINGH CHITTAURA (VPL) PWS | 20098970/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *Cube test failed for teh sample of 2nd flight of stair case. | ||||||||||||
| 19 | 20099007 | MAJHAUBWA VISHESWARGANJ (VPL) PWS | 20099007/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Brace steel lapping length is not as per IS standard. *Crank in column reinforcement bars has not been developed as per approved design and specification. | |||||||||||
| 20 | 20099788 | PARSA RAMPUR PHAKARPUR (VPL) PWS | 20099788/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | *Ring beam alignment not as per approved drawing, ring beam found in zig zig manner. *Column not casted as per approved drg , miss alignment in vertical column bars | |||||||||||||
| 21 | 20099808 | GAURIYA & JOGANIYA MIHIPURWA (VPL) MVS PWS | 20099808/01 | Yes | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | *Minor cracks observed at brace beam due to poor quality concreting. *Dimensional error in all Brace beam no as per approved drawing. *Minor honey comb at column due to poor compaction due to concreting. | ||||||||||
| 22 | 20092791 | CHILAULI JARWAL (VPL) PWS | 20092791/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *28 days cube fail 4th brace beam. | ||||||||||||
| 23 | 20092772 | GAUR JARWAL (VPL) PWS | 20092772/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *OHT 6th flight stair case 28 days cube didn't achieve target mean strength. | ||||||||||||
| 24 | 20099015 | SALARPUR CHITAURA (VPL) MVS PWS | 20099015/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *OHt 8th flight 28 days cube not attain desired strength. | ||||||||||||
| 25 | 20093206 | DHODHAYAL TEJWAPUR (VPL) PWS | 20093206/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *OHT 28 days 1st brace beam cube fail. | ||||||||||||
| 26 | 20098989 | SIDARKHA KAISARGANJ (VPL) PWS | 20098989/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *cube is not filled at the time of casting | ||||||||||||
| 27 | 20099778 | CHANDANPUR BALAHA (VPL) PWS | 20099778/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *4th lift stair case 28 days cube fail. | ||||||||||||
| 28 | 20092931 | BAMIYARI PAKHARPUR (VPL) PWS | 20092931/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | *No concrete test cubes were cast during concreting, indicating non-compliance with standard quality control procedures and very poor workmanship. *As per approved drawings, the staircase tread width is specified as 250 nrrn, whereas only 230 mm was found at site, which is a deviation from the approved design. | |||||||||||
| 29 | 20099782 | PAWAHI KAISARGANJ (VPL) PWS | 20099782/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | *3 column caste without cube fill, 10mm aggregate not available at site. | ||||||||||||
| 30 | 20099008 | SHIVPUR BAIRAGI VISHESWARGANJ (VPL) PWS | 20099008/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | *regarding deviation in brace beam dimension from approved drawing. | ||||||||||||
| 31 | 20093332 | BARAI BILASA CHITAURA (VPL) MVS PWS | 20093332/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | *Cube failed of 28 days of 1st lift column above 2nd brace | ||||||||||||
| 32 | 20099010 | UCHWA PURAINA CHITTAURA (VPL) PWS | 20099010/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | *HONEYCOMB IS OBSERVED IN STAIRCASE SLAB . | ||||||||||||
| 33 | 20099005 | KARNIYA RISIA (VPL) PWS | 20099005/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *Few vertical columns steel is chopped at GL level. | ||||||||||||
| 34 | 20098948 | NIBIYASHAH MOHAMMADPUR BALAHA (VPL) PWS | 20098948/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *Few vertical columns steel chopped at GL level . | ||||||||||||
| 35 | 20098950 | TULSIPUR BALAHA (VPL) PWS | 20098950/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *Few vertical columns steel chopped at GL level . | ||||||||||||
| 36 | 20093234 | UDHARANA SARAHDI VISHESWARGANJ (VPL) PWS | 20093234/01 | No | No | No | Yes | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | *due to prolonged suspension of work , all reinforcement steel in the grade beam of the OHT structure has become rusted from continuous exposure without any protective covering. *Certain vertical reinforcement bars of the column have been cut and appear to have been stolen | |||||||||||
| 37 | 20098996 | PEERNASARUDDIN NAWABGANJ (VPL) PWS | 20098996/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | *Regarding misalignment in GL brace and minor honeycomb in column brace junctions. | ||||||||||||
| 38 | 20099787 | BHAGWANPUR KURMIYANA MIHIPURWA (VPL) PWS | 20099787/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | *The shuttering at the column brace junction is improper. *There is misalignment in columns at junction points. *There are major honeycombing at beams and columns. | ||||||||||
| 39 | 20101738 | MOTIPUR MIHIPURWA (VPL) PWS | 20101738/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | *Honeycomb is observed in column and brace beam. *Column is not vertically aligned and section is not properly casted. *Center to center distance between two columns has 30-40 mm variation from drawing. | ||||||||||||
| 40 | 20101733 | NAGAR CHITTAURA (VPL) PWS | 20101733/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *1st staircase cantilever beam reinforcement cut from column. | ||||||||||||
| 41 | 20092859 | MOHANAPUR GANGAPUR MIHIPURWA (VPL) PWS | 20092859/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | *Due to prolonged suspension of work, all reinforcement steel in the column of the OHT structure has become rusted from continuous exposure without any protective covering. | ||||||||||||
| 42 | 20093190 | MANIKPUR BAGHAULI SHIVPUR (VPL) PWS | 20093190/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | *Regarding rusting of Beam steel at GL level beam . | ||||||||||||
| 43 | 20092866 | AYODHYA GAON MIHIPURWA (VPL) PWS | 20092866/01 | Yes | No | No | Yes | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | *Dimensional error in all Brace beam not as per approved drawing. *Rusted reinforcement steel found at full stagging possible due to long delay in casting. *Minor honeycomb is brace column junction due to poor compaction due to concreting. | |||||||||||
| 44 | 20093179 | PIPARI MAFI SHIVPUR (VPL) PWS | 20093179/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | *All column is not vertically aligned. | ||||||||||||
| 45 | 20099016 | NAWAPATTI CHITAURA (VPL) MVS PWS | 20099016/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | *The improper shuttering has led to alignment issues between the columns and brace beams. *Brace beam from one column got settled due to improper vertically support to the brace beam bottom shuttering at the time of casting. *Major honeycombing observed in columns and beams due to improper use of shuttering & poor-quality execution. | ||||||||||||