Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20097282 PARAS RAMPUR_ BISUNAPUR 20097282/01 No Yes No No No No No No No No No No No 1. Brace beams and Column of OHT show noticeable misalignment..
2 20088912 TULSIPUR 20088912/01 No No No No No Yes No No No No No No No 1. Regarding Leakage has been observed at multiple locations in the overhead tank, indicating inadequate waterproofing and poor workmanship.
3 20093247 RAMPUR_LAKSHAMANPUR GANGAPUR 20093247/01 Yes No No No No No No No Yes No No No No 1. The bottom dome beams of the OHT have honeycombing, and it has been several days since the last flight ofthe staircase was costed, but the de-suturing has not been done yet.
4 20092698 PURUSHOTTOMPUR 20092698/01 No No No No No No No No Yes No No No No 1. Leakage/seepage observed in OHT bottom dome.
5 20088945 JOGIN BHARIYA 20088945/01 No No Yes No No No No No No No No No No Resolved 1.Cube Test failed of OHT Column above 2nd brace beam during compressive strength test. पत्रांक संख्या: - 1125 / VPL /HYD/SBT/2025-26 दिनांक- 13/08/2025
6 20092984 SHRI NAGAR 20092984/01 Yes No No No No No No No No No No No No Resolved 1. Honeycomb has been observed in second brace of OHT. पत्रांक संख्या: - 1135 / VPL /HYD/SBT/2025-26 दिनांक- 19/08/25
7 20093199 JHIRJHIRAWA 20093199/01 No No No No No No Yes No No No No No No Resolved The casting of Raft foundation has been done in late night on 19-06-2025 and heavy rain occurred after concreting work due to which concrete of raft submerged under water within 4 hours of pouring, it can pose serious risks to the strength, durability, and integrity of the structure due to the disruption of the initial setting and hydration process of cement. पत्रांक संख्या: 1086 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/2025
8 20093126 PATPAR GANJ_BABHAN PURWA 20093126/01 Yes No No No No No No No No No No No No Resolved 1. Honeycomb has been observed at brace beam and at joint of stairs with column. 2. Crack has been observed in platform of stairs. पत्रांक संख्या: 1089 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/25
9 20092749 PIPRAHWA JOGA GAON 20092749/01 Yes No No No No No No No No No No No No Resolved 1. Honeycomb is found in oht 1st brace. पत्रांक संख्या: 1330 / VPL /HYD/SBT/2025-26 दिनांक- 20/11/2025
10 20092951 MADHVAPUR 20092951/01 Yes No No No No No No No No No No No No Resolved 1. Honeycomb found in 3rd brace. पत्रांक संख्या: 1087 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/25
11 20074384 RAMPUR KAKRA 20074384/01 No No No Yes No No No No No No No No No Resolved 1. The project was halted for some time and vertical reinforcement bars of columns were cut from the bottom may leads to structure durability & stability failures. पत्रांक संख्या: 1328 / VPL /HYD/SBT/2025-26 दिनांक- 20/11/2025
12 20074610 ETWARIYA 20074610/01 No No No Yes No No No No No No No No No Resolved 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. पत्रांक संख्या: 1090 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/25
13 20089735 VIJAYPUR SISAWAN 20089735/01 No No No Yes No No Yes No No No No No No Resolved Resolved 1. Rusted steel was used and material test was not done before casting. No RFI raised and no information given before casting. पत्रांक संख्या: 1660 / VPL /HYD/SBT/2025-26 दिनांक- 23/04/2026 2. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. पत्रांक संख्या: 1384/ VPL /HYD/SBT/2025-26 दिनांक- 08/12/2025
14 20093335 PIPRAHAWA_BAHADURPUR 20093335/01 No No No Yes No No No No No No No No No Resolved 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. पत्रांक संख्या: 1083 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/25
15 20088894 GILAULI 20088894/01 No No No Yes No No No No No No No No No Resolved 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. Letter Number: 1165 VPL /HYD/SBT/2025-26 Date: 30/08/25
16 20097127 Kevalpur W/S 20097127/01 No No No Yes No No No No No No No No No Resolved 1. The stirrup provided in OHT slab beam BT1,BT2 and the ring beam have hook lengths rainnig from 40mm to 50mm which is not as per approval drwaing. 2. Some of the strupes hooks in the OHT slab beam have been bent at a 90-degree angle, whereas the approval drwaing specify a hook bend angale of 135-degree. Letter Number: 1143 / VPL /HYD/SBT/2025-26 Date: 22/08/2025
17 20093189 MANSUKHA_KALYANPUR 20093189/01 No No No Yes No No No No No No No No No Resolved 1. Due to the prolonged suspension of construction activities steel found Corroded which may affect the durability& stability of the structure. Letter Reference Number: 1327/VPL/HYD/SBT/2025-26 Date: 20/11/2025
18 20088956 BHOWSAWAN_KURBENI 20088956/01 Yes No No Yes No No No No No No No No No Resolved Resolved 1. Major Honeycomb was found in 2nd and 3nd brace beam,Rinforcement has been visible on surface of top dome opening, 2. Due to prolonged suspension of construction activities steel found corroded which may affect the durability & stability of structure. Letter Number: 1315/VPL/HYD/SBT/2025-26 Date: 14/11/2025
19 20097250 LALPUR AYODHYA 20097250/01 No No No Yes No No No No No No No No No Resolved 1. Due to the prolonged suspension of construction activities steel found Corroded which may affect the durability& stability of the structure. Letter Number: 1374/VPL/HYD/SBT/2025-26 Date: 05/12/2025
20 20074430 JORDIH 20074430/01 Yes No No Yes No No No No No No No No No Resolved Resolved 1. Major Honeycomb was found in 3rd and 2nd flight beam on stairs. 2. Reinforcement has been visible on the surface of 3rd flight beam on stairs due to poor workmanship. 3. Major Honeycomb was found in 3rd brace beam. Letter Number: 1316/VPL/HYD/SBT/2025-26 Date: 14/11/2025
21 20074435 MAHADEO JAGDISH 20074435/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work No concreting or febrication shall proceed until corrective action are taken. Letter Number: पत्रांक संख्या: 1329/VPL/HYD/SBT/2025-26 Date- 20/11/25
22 20074413 MUJHANIYA 20074413/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. पत्रांक संख्या: 1373 / VPL / HYD / SBT / 2025-26 Date:- 05/12/2025
23 20075953 ALI NAGAR DHARAN NAGAR 20075953/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. Letter Number:-1332 / VPL / HYD / SBT / 2025-26 Date: - 20/11/2025
24 20092861 BIRPUR 20092861/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. Letter Number:- 1385 / VPL / HYD / SBT / 2025-26 Date: - 08/12/2025
25 20074373 KAKARDARI 20074373/01 No No No Yes No No No No No No No No No Resolved 1. OHT Work is stopped from last 22 months after attending column up to 1 brace beam level. 2. Due to the prolonged suspension of construction activities column steel Found Corroded which may affect the durability & stability of the structure. The main reinforcement in the OHT column has not been lapped as specified within the designated lapping zone according to the approved design and drawings. Letter Number:- 1649 / VPL / HYD / SBT / 2026-27 Date:- दिनांक- 23/04/2026
26 20097240 DURGAPUR KP 20097240/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. Letter Number:- 1441 / VPL / HYD / SBT / 2025-26 Date: - 08/01/2026
27 20097128 Rajapur Birpur W/S 20097128/01 No No No Yes No No No No No No No No No Resolved 1. lt is observed that staircase steel rusted found at site. Letter no 1471 / VPL /HYD/SBT/2025-26 Date : 29/01/2026
28 20092885 SONPUR KALAN 20092885/01 No No No Yes No No No No No No No No No Resolved 1. OHT work has been completed up to GL level. However, the work has been stopped for a long period. Due to prolonged stoppage of work, rusting has been observed on the reinforcement steel of columns above GL level. Letter no 1662 / VPL /HYD/SBT/2026-27 Date: 28/04/26
29 20074376 KHAJUHA JHUNJHUNIA 20074376/01 Yes No No No No No No No No No No No No Resolved 1. During inspection, honeycombing was observed at various flights of the staircase of the Overhead Tank (OHT), indicating inadequate concrete compaction and poor workmanship. Water logging was also noticed due to insufficient drainage, which may lead to durability issues. 1. Additionally, one of the second braces was found to be executed with improper dimensions and is not in conformity with the approved drawings and design specifications also minor honeycomb at junction of column and ringbeam. Letter no 1679 / VPL /HYD/SBT/2026-27 Date 06/05/26
30 20088929 MOHMMADPUR RAJA 20088929/01 No No No No No No No No Yes No No No No Resolved 1. Critically Water leakage has been observed from several points in bottom dome of OHT. Letter no 1630 / VPL /HYD/SBT/2026-27 Date 15/04/26
31 20093351 KUNDA 20093351/01 No No No No No No Yes No No No No No No Resolved 1. Crack beam has been observed ring beam of OHT crack has been seen in balkani clamp has been not provided di pipe. Letter no 1602 / VPL /HYD/SBT/2025-26 Date 20/03/2026
32 20074379 MAKSRIHVA 20074379/01 Yes No No Yes No No No No No No No No No Resolved Resolved 1. Major Honeycomb was observed in the columns and braces of the overhead tank in Hariharpur Rani Gram Panchayat block, and the first brace has suffered minor damage. 2. The steel reinforcement for the bottom dome was installed 5 months ago, but the concrete casting has not yet been done, resulting in severe rusting of the steel in the bottom dome. 3. Poor workmanship was also observed in several areas of the overhead tank. Letter no 1678 / VPL /HYD/SBT/2026-27 Date: 06/05/26
33 20074370 JANKI NAGAR 20074370/01 No No No No No No Yes No No No No No No Resolved 1. Plinth protection is being constructed for the OHT, in which PPC cement is being used. 2. The bricks for the side drain at the plinth level are being laid without conducting any tests. Letter no 1556 / VPL /HYD/SBT/2025-26 Date: 27/02/2026
34 20092891 DARE KUIEYA 20092891/01 No No No No No No No No Yes No No No No Resolved 1. seepage observed in OHT bottom dome. Letter Number: 1670 / VPL / HYD / SBT / 2026-27 Date: 02 / 05 / 2026
35 20092973 IMALIYA KARANPUR 20092973/01 No No No No No No No No Yes No No No No Resolved 1. seepage observed in OHT bottom dome. Letter Number: 1669 / VPL / HYD / SBT / 2026-27 Date: 02 / 05 / 2026
36 20097271 SEMRI CHAK PIHANI 20097271/01 No No No No No No No No Yes No No No No Resolved 1. Seepase has been observed under the bottom dome of OHT , Crecke found in boundray wall. Letter Number : 1176 / VPL / HYD / SBT / 2025-26 Date: 05 / 09 / 2025
37 20092870 SANGRAMGANJ 20092870/01 No No Yes No No No No No No No No No No Resolved 1.Cube Test failed for 3rd Brace Beam (28 Days) during compressive strength test in GP-Sangramganj. Letter Number: 055 / VPL / HYD / SBT / 2025-26 Date: 09 - 06 - 2025
38 20088944 CHAILAHI 20088944/01 No No Yes No No No No No No No No No No Resolved 1. Cube Test failed for raft concreting of OHT (28 Days) during compressive strength test. Letter Number: 860 / VPL / HYD / SBT / 2025-26 Date: 09 / 06 / 2025
39 20088900 RAMNAGARA 20088900/01 No No No No No No Yes No No No No No No Resolved 1. Raft casting of the OHT is in progress, and the concrete is being mixed using a manual mixture machine instead of weight batcher mixing machine. Also, the vibrator is not being operated properly. Letter Number: 1668 / VPL / HYD / SBT / 2026-27 Date: 02/05/2026
40 20097283 LAKHNA 20097283/01 No No Yes No No No No No No No No No No Resolved 1.Cube Test failed for raft of OHT (28 Days) during compressive strength test in GP-Lakhna Letter Number): 860 / VPL / HYD / SBT / 2025-26 (Date: 09/06/2025
41 20088892 DIKAULI 20088892/01 Yes No No No No No No No Yes No No No No 1. Leake observed in bottom dome RRC water tank. 2. oneycombing has been observed at the junction of the OHT column and ring beam, which indicates negligence during shuttering removal and poor workmanship. Reinforcement steel is visible in the cylindrical wall of the OHT, which may lead to corrosion and reduce the durability of the structure. 3. A piece of bamboo was found embedded in the OHT slab near the cylindrical wall, indicating poor concreting work. The ladder and top dome railing are damaged, posing a safety risk and requiring immediate repair. The top dome cover is rusted. 4. The plinth protection has settled due to improper compaction, resulting in an uneven surface and increasing the possibility of water ingress near the structure.
42 20088935 MAHDEIYA 20088935/01 No No No Yes No No No No Yes No No No No Resolved 1. Critically Water leakage has been observed from several points in bottom dome of OHT it is recommended kindly fill water in tank after rectification work and DI pipe also leakaging. 2.The project was halted for some time and vertical reinforcement bars of all five columns were cut from the bottom may leads to structure durability & stability failures. Letter Number: 1035 / VPL / HYD / SBT / 2025-26 Date: 14/07/2025
43 20088947 PATKHAULI 20088947/01 No No No Yes No No Yes No No No No No No Resolved Resolved 1. Material test was not done before casting. No RFI raised and no information given before casting. Letter Number: 1234 VPL /HYD/SBT/2025-26 Date: 20/09/2025 2. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. Letter Number: 1081 VPL /HYD/SBT/2025-26 Date: 23/07/2025
44 20088948 SAMHAR PURAWA 20088948/01 No No No Yes No No No No No No No No No Resolved 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. पत्रांक संख्या: 1082 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/25
45 20088924 CHAINPUR 20088924/01 No Yes No Yes No No No No No No No No No Resolved Resolved 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. पत्रांक संख्या: 1090 / VPL /HYD/SBT/2025-26 दिनांक- 23/07/25 2. Brace beams and Column of OHT show noticeable misalignment. पत्रांक संख्या: 1706/ VPL /HYD/SBT/2026-27 Date 20/05/2026
46 20097262 BAHORWA 20097262/01 Yes No No Yes No No No No No No No No No Resolved Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. Letter Number:-1320 / VPL / HYD / SBT / 2025-26 Date:- 17/11/25 3. Honeycomb are seen column abouve 3rd and 2nd brace the junction of staire case and oht column finishing is very poor quality. Letter Number: 1709 / VPL / HYD / SBT / 2026-27 Date: 20 / 05 / 26
47 20097263 MAHADEWA 20097263/01 No No No Yes No No No No No No No No No Resolved 1. The work has been suspended for a prolonged period. 2. Due to prolonged exposure and lack of protective measures, corrosion of the reinforcement steel has been observed in the columns and staircase members. Letter Number: 1707 / VPL / HYD / SBT / 2026-27 Date: 20 / 05 / 26
48 20097126 Tilakpur W/S 20097126/01 Yes No No No No No No No No No No No No Resolved 1. Major Honeycomb was found in 1st and 2nd brace beam and Stairecase. 2. Reinforcement has been visibale on surface of column above 2nd brace beam. Letter Number: 1331 / VPL / HYD / SBT / 2025-26 Date: 20/11/25
49 20097280 TENDWA MAHANT 20097280/01 Yes No No Yes No No Yes No No No No No No Resolved Resolved Resolved 1. Staircase steel found rusted and minor honeycomb found in balcony slab. 2.The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures.water logging under OHT and Pump House. Letter no 1631 / VPL /HYD/SBT/2026-27 Date: 15/04/26 3. Old ruptured Bamboos is being used instead of MS Scaffolding 2)No walkways and guardrails observed to prevent falling of workmen 3)Safety net has not been provided to prevent from falling objects 4)No Safety engineer deputed on sites 5)Poor access observed due to which top dome steel checking cannot be done Letter no 1708 / VPL /HYD/SBT/2025-26 Date: 20/05/26
50 20093082 BHARTHAPUR 20093082/01 No No No No No No No No Yes No No No No Resolved 1. During the hydrostatic testing of the Overhead tank OHt water seepage was observed in the tank. Letter no 1716/VPL/HYD/SBT/2026-27 Date -24-05-2026
51 20093343 BHIKHPUR TARAI_BENI DIHUA 20093343/01 Yes No Yes Yes No No No No No No No No No Resolved Resolved Resolved 1.Bhikhpur Tarai Gram Panchayat (Sirsia Block), the formwork for the bottom dome ring beam of the overhead tank had not been completely removed even 3 to 4 months after casting. The removal process began only a few days ago, and even now, the formwork has not been fully cleared away. Consequently, significant honeycombing has appeared in several sections of the bottom ring beam, and in many places, the stirrups of the ring beam are fully exposed; this condition could potentially compromise the structural integrity of the bottom ring beam in the future. पत्रांक संख्या: 1717/ VPL /HYD/SBT/2026-27 दिनांक: 24/05/2026 2. Major huneycombing is visible in the overhead tank cylindirical wall and top tope. पत्रांक संख्या: 1717/ VPL /HYD/SBT/2026-27 दिनांक: 24/05/2026 2. Cube Test failed for Column above 2nd Brace Beam (28 Days) during compressive strength test in GP-Bhikpur Tarai पत्रांक संख्या: 1085 / VPL /HYD/SBT/2025-26 दिनांक: 23/07/2025
52 20093115 HARIHARPUR MAHRAJ NAGAR 20093115/01 Yes Yes No No No No No No No No No No No Resolved Resolved 1. Second breace beam is not alignment,finshing of staire is very poor quality, 2. Honeycomb has been found at Top dome. Compliance Letter no 1726/VPL/HYD/SBT/2026-27 Date -30-05-2026
53 20092940 MANWARIYA BOJHA 20092940/01 No No No Yes No No No No No No No No No Resolved 1. The reinforcement above the GL at the staircase has been cut, and the steel is completely rusted. 2. In the cylindrical wall, the first lift casting was done a long time ago, but the second lift casting has not yet been carried out. 3. The exposed steel reinforcement is heavily rusted. Compliance letter no - 1725/VPL/HYD/SBT/2026-27 Date 305-2026
54 20089749 LUXMANPUR GORPURWA_GANESHPUR 20089749/01 No No No No No No No No Yes No No No No Resolved 1. Seepage in observed in over Head tank bottom dome and poor workmanship observed in brace junction and finishing work required in 2nd brace. Compliance Letter no 1724/VPL/HYD/SBT/2026-27 Date-30-05-2026
55 20074445 RAMWAPUR 20074445/01 No No No No No No Yes No No No No No No Resolved 1. Cover blocks are not placed properly. 2. Proper safety not maintained by the manpower at site. 3. PPE kit are not available for manpower at site. 4. Weight batcher are not available at site., 5. Vibrator & compaction not done properly & Cube mould was not available on site as per requirement. Compliance Letter no -1723/VPL/HYD/SBT/2026-27 Date 30-05-2026
56 20088899 KATHA 20088899/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. Compliance Letter no 1727/VPL/HYD/SBT/2026-27 Date-01-06-2026
57 20088914 RAJAPUR RANI 20088914/01 No No No Yes No No No No No No No No No Resolved 1. Over Head tank column steel was fully rusted due to work stopped since Long time and one stairs steel cutting. Compliance Letter no 1728/VPL/HYD/SBT/2026-27 Date-01-06-2026
58 20097256 SONBARSA 20097256/01 Yes No No No No No No No No No No No No Resolved 1. Miner honeycomb are visible in over Head tank stairs and poor workmanship observed. 2. Over Head tank column and brace Finishing work required Compliance Letter no 1729/VPL/HYD/SBT/2026-27 Date-01-06-2026
59 20092764 BARGADAHA 20092764/01 Yes No No No No No No No No No No No No Resolved 1. the paint finishing is not correct, plinth protection is creak, second brace has been minor honeycombs. Compliance Letter no 1730/VPL/HYD/SBT/2026-27 Date-01-06-2026
60 20089758 ETAUNJHA_BARAIPUR 20089758/01 No No No Yes No No No No No No No No No Resolved 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work 2. No concreting or febrication shall proceed until corrective action are taken. Compliance Letter no 1731/VPL/HYD/SBT/2026-27 Date-01-06-2026
61 20089740 DAHAVER KALAN_BHOJPUR 20089740/01 Yes No No No No No No No No No No No No Resolved 1.Major Honeycomb observed during site visit in 1st brace beam. Compliance Letter no- 1085/VPL/HYD/SBT/2025-26दिनांक (Date): 28/07/2025
62 20100192 GANDHI 20100192/01 No No No No No No No No No No No No No
63 20097324 RAMNAGAR CHIRADIH 20097324/01 No No No No No No No No No No No No No
64 20093092 JAGRAWAL GARHI 20093092/01 No No No No No No No No No No No No No
65 20088895 GODARI 20088895/01 No No No No No No No No No No No No No
66 20088951 SHAHPUR PURE SHIVDIN 20088951/01 No No No No No No No No No No No No No
67 20088901 RANIPUR QUAZI 20088901/01 No No No No No No No No No No No No No
68 20088910 TILAKPR 20088910/01 No No No No No No No No No No No No No
69 20100189 KHAIRY TARAI 20100189/01 No No No No No No No No No No No No No
70 20093299 GANGAPUR_SENAURA TARAI 20093299/01 No No No No No No No No No No No No No
71 20092879 AMARAHWA 20092879/01 No No No No No No No No No No No No No 1- lt is observed that staircases reinforcement steel cut/removed from the waist slab, tread and riser and landing anchorage. 2- Over Head tank work stopped in the last year and stajrs steel and 3rd brace above cotumn steelwas found rusted at site.
72 20093100 TITIHIRIRA 20093100/01 No No No No No No No No No No No No No
73 20097241 HEMPUR 20097241/01 No No No No No No No No No No No No No
74 20088952 TANDUWA RATANPUR 20088952/01 No No No No No No No No No No No No No
75 20097287 ACHARAURA SHAHPURA_ ASNI 20097287/01 No No No No No No No No Yes No No No No Resolved 1. Seepage has been observed in the bottom dome of the Overhead Water Tank . 1742/VPL/HYD/SBT/2026-27 DATED 08-06-2026
76 20088918 BELHA RAGHAV 20088918/01 Yes No No No No No No No No No No No No Resolved 1. Honeycomb are visible in 3rd brace and bottom ring beam and finishing work required in top slab of over Head tank 1743/VPL/HYD/SBT/2026-27 DATED 08-06-2026
77 20097264 DIKRA 20097264/01 Yes No No No No No No No No No No No No Resolved 1. Honeycombing has been observed in the second brace of the OHT, where the reinforcement steel is exposed. 2. Similar honeycombing is also observed in the column, with reinforcement steel visible. 3. These deficiencies indicate poor concrete compaction and inadequate cover, which may adversely affect the structural strength and durability of the OHT. Compliance letter - 1747/VPL/HYD/SBT/2026-27 Date 11-06-2026
78 20089731 MANIHAR TARA 20089731/01 Yes No No No No No No No No No No No No Resolved Honeycombing has been observed in the first brace and column of the overhead tank, indicating poor compaction and inferior quality of concrete. These deficiencies may reduce the structural strength and durability of the overhead tank, and immediate corrective measures are required. Complaince Letter - 1748/VPL/HYD/SBT/2026-27 Date -11-06-2026
79 20097302 MADRAHVA_ BELHARI 20097302/01 No Yes No Yes No No No No No No No No No Resolved 1. Belhari Zone 01 OHT work is pending 07-08 month due to which steel is found corroded.(Zone-1) Compliance Letter 1777/VPL/HYD/SBT/2026-27 Date 22-06-2026 1. Brace beams of OHT show noticeable misalignment. Cracks have been observed in the platform of stairs.(Zone-2)
80 20092850 BISHUNAPUR RAMNAGAR 20092850/01 Yes No No No No No No No No No No No No Resolved 1- Major honeycombing is visible in the overhead tanks 2nd and 3rd brace beam junction and steel are visible at junction. 2- Over Head tank work stopped for a long time. Compliance Letter 1776/VPL/HYD/SBT/2026-27 Date 22-06-2026