| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20097691 | KHIJIRPUR W/S SCHEME (HFCL) | 20097691/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycombing was observed in the column of OHT, indicating poor compaction or improper concrete placement, which may affect the structural integrity. Rectification Status- Rectified Observation- Honeycombing repaired by cement grouting. | ||||||||||||
| 2 | 20086391 | DHARI KHURD W/S SCHEME (HFCL) | 20086391/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted steel reinforcement was used in the column, which may affect the bond strength with concrete and compromise the structural integrity. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction | ||||||||||||
| 3 | 20111029 | KHATIRPUR W/S SCHEME (HFCL) | 20111029/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in column of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Photo of coating with anti-rust chemical provided by TKC. | ||||||||||||
| 4 | 20088188 | TODERPUR W/S SCHEME (HFCL) | 20088188/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- 1. The cover block provided for the column reinforcement does not meet the specified thickness as per design and code requirements, which may lead to reduced durability and increased risk of reinforcement corrosion 2. Rusted steel was used in the OHT column reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability | ||||||||||||
| 5 | 20091435 | BELSARI W/S SCHEME (HFCL) | 20091435/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT raft casting reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability | ||||||||||||
| 6 | 20097737 | ALAMPUR & SONA W/S SCHEME (HFCL) | 20097737/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Observation- OHT Column steel found damage condition and all steel cut. | |||||||||||||
| 7 | 20088202 | HASANPUR W/S SCHEME (HFCL) | 20088202/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Observation- OHT Column steel found Damage Condition and Steel Cut. | |||||||||||||
| 8 | 20086418 | TOKAWA W/S SCHEME (HFCL) | 20086418/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- OHT Ground brace beam Shuttering alignment not in center of column. | ||||||||||||
| 9 | 20097687 | BARAR & JANUPUR W/S SCHEME (HFCL) | 20097687/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Radial bars has been not provided at inner and outer portion according to specifications | ||||||||||||
| 10 | 20086449 | MARDANPUR W/S SCHEME (HFCL) | 20086449/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT Plinth beam . This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability | ||||||||||||
| 11 | 20086425 | BURANPUR W/S SCHEME (HFCL) | 20086425/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 12 | 20086281 | ODASAN W/S SCHEME (HFCL) | 20086281/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 13 | 20100536 | SALEMPUR BAGHAI W/S SCHEME (HFCL) | 20100536/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 14 | 20074299 | DEVAPAR W/S SCHEME (HFCL) | 20074299/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 15 | 20100552 | CHAK PAHAR M.MURTAJPUR W/S SCHEME (HFCL) | 20100552/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 16 | 20097674 | CHAK JAINAB W/S SCHEME (HFCL) | 20097674/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 17 | 20075421 | JAHNI W/S SCHEME (HFCL) | 20075421/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 18 | 20088257 | GOPALPUR W/S SCHEME (HFCL) | 20088257/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 19 | 20073819 | AARIPUR W/S SCHEME (HFCL) | 20073819/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 20 | 20088430 | JAIRAMPUR MANGWAL W/S SCHEME (HFCL) | 20088430/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 21 | 20088221 | SARDARPUR W/S SCHEME (HFCL) | 20088221/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 22 | 20088470 | KANERI W/S SCHEME (HFCL) | 20088470/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 23 | 20075942 | BARAULI SULTAN SINGH W/S SCHEME (HFCL) | 20075942/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 24 | 20086207 | MOUDIHA & BARWA KHURD W/S SCHEME (HFCL) | 20086207/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 25 | 20088408 | MALIKPURA W/S SCHEME (HFCL) | 20088408/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 26 | 20100557 | BURANPUR W/S SCHEME (HFCL) | 20100557/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 27 | 20086446 | SONBARSA W/S SCHEME (HFCL) | 20086446/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 28 | 20092091 | SARAI DHANESH W/S SCHEME (HFCL) | 20092091/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 29 | 20074377 | JALALPUR DHANI W/S SCHEME (HFCL) | 20074377/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 30 | 20092007 | KISHUN PUR W/S SCHEME (HFCL) | 20092007/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 31 | 20088275 | NEWADA W/S SCHEME (HFCL) | 20088275/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Observation- OHT column and plinth beam are not in proper alignment. Honeycomb observed in OHT Column and plinth beam area. Observation- OHT column and plinth beam are not in proper alignment. Honeycomb observed in OHT Column and plinth beam area. TKC- NC’s Letter no.- MTCPL/SWSM/TPIA- CLUSTER-17/2024-25/105393 Letter Date- 25.12.2024 Block- Saidpur Scheme- Newada Rectification Status- Rectified Observation-Plinth beam alignment rectified | ||||||||||||
| 32 | 20097086 | TODAR PUR W/S SCHEME (HFCL) | 20097086/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation-1. The cover block provided for the column reinforcement does not meet the specified thickness as per design and code requirements, which may lead to reduced durability and increased risk of reinforcement corrosion 2. Rusted steel was used in the OHT column reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- 1-Rectified, 2- Rectified | ||||||||||||
| 33 | 20094505 | KHANPUR RAGHUBAR RAI & KRITSINGH PUR W/S SCHEME (HFCL) | 20094505/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Hook bending of reinforcement bars at 135 degrees, as specified in IS 2502 and IS 456:2000, was not provided. This non-compliance may lead to inadequate anchorage and compromised structural integrity, particularly in seismic or high-stress zones." Rectification Status- Rectified Observation-135 degrees hook bending rectified | ||||||||||||
| 34 | 20074381 | KANUWAN W/S SCHEME (HFCL) | 20074381/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- The spacing of reinforcement steel bars was found to be inconsistent with the approved structural drawings. Such deviation may affect the structural performance and load distribution, and must be rectified to comply with design specifications. Rectification Status- Rectified | ||||||||||||
| 35 | 20088510 | MUHAMMADPUR W/S SCHEME (HFCL) | 20088510/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Cover block not provided properly according to specifications, required 50mm but provided 30mm Rectification Status- Rectified | ||||||||||||
| 36 | 20073704 | SUZNI PUR W/S SCHEME (HFCL) | 20073704/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- 1. Proper bending of OHT column ring hook at 135 degrees was not provided. 2. Cover block of OHT raft foundation not provided as per specified thickness. Rectification Status- 1-Rectified, 2-Rectified | ||||||||||||
| 37 | 20097015 | MATH UCHORI W/S SCHEME (HFCL) | 20097015/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- OHT Coloumn steel is found in damaged condition. Rectification Status- Rectified | ||||||||||||
| 38 | 20086393 | UTTAMPUR W/S SCHEME (HFCL) | 20086393/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- During the inspection, reinforcement steel was observed getting rusted due to exposure to environmental conditions. This can compromise the bond with concrete and affect the structural durability if not addressed promptly. Rectification Status- Rectified | ||||||||||||
| 39 | 20073748 | BELHARA W/S SCHEME (HFCL) | 20073748/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Observation- Rusted and corroded steel was used in the OHT column reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 40 | 20100532 | CHAK MUKURI BAREJPUR W/S SCHEME (HFCL) | 20100532/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- A visible crack has been observed on the OHT column. Rectification Status- Rectified | ||||||||||||
| 41 | 20088558 | UCHORI W/S SCHEME (HFCL) | 20088558/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Honeycomb visible in OHT Column area, proper finishing is required. Rectification Status- Rectified | ||||||||||||
| 42 | 20097732 | PAHARPUR TAUFIR W/S SCHEME (HFCL) | 20097732/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Observation- Alignment of the brace beam has not been executed as per design specifications. This misalignment can lead to structural inefficiency and potential stability concerns in the OHT framework. Rectification Status- Rectified | ||||||||||||
| 43 | 20094383 | MUDARNA (MUDARBHA) W/S SCHEME (HFCL) | 20094383/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Proper Dressing with Compaction is required in OHT Excavation for PCC work. Rectification Status- Rectified | ||||||||||||
| 44 | 20086196 | VASILA & JAGMAL ZOT W/S SCHEME (HFCL) | 20086196/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT coloumn reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 45 | 20073711 | CHOKARI_W/S_SCHEME | 20073711/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- During the inspection of the OHT (Overhead Tank) column ring reinforcement work, it was observed that proper binding of ring hooks at 135 degrees was not provided as per standard detailing requirements. Rectification Status- Rectified | ||||||||||||
| 46 | 20086345 | OTANA W/S SCHEME (HFCL) | 20086345/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- During the inspection of the OHT (Overhead Tank) column ring reinforcement work, it was observed that proper binding of ring hooks at 135 degrees was not provided as per standard detailing requirements. Rectification Status- Rectified | ||||||||||||
| 47 | 20086359 | ENDRAPUR CHHIRI W/S SCHEME (HFCL) | 20086359/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT plinth beam. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. 2. OHT plinth beam shuttering is not aligned. 3. Rusted steel was used in the OHT column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- 1- Rectified,2- Rectified, 3- Rectified | ||||||||||||
| 48 | 20073666 | PAHARIPUR W/S SCHEME (HFCL) | 20073666/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Honeycomb has been observed in the brace beam at the junction of columns 2. Honeycomb has been observed at junction of columns and brace beam Rectification Status-1- Rectified, 2- Rectified | ||||||||||||
| 49 | 20074355 | BAHRAMPUR W/S SCHEME (HFCL) | 20074355/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 50 | 20093397 | CHAITHO BANDH W/S SCHEME (HFCL) | 20093397/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Segregation was observed during concrete casting. Rectification Status- Rectified | ||||||||||||
| 51 | 20088204 | DUDHAURA W/S SCHEME (HFCL) | 20088204/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Segregation was observed during concrete casting. Rectification Status- Rectified | ||||||||||||
| 52 | 20102083 | PURAN PUR W/S SCHEME (HFCL) | 20102083/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT slab casting works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 53 | 20088383 | LOHWA & HAZIPUR BARESAR & HASANPUR GAURA W/S SCHEME (HFCL) | 20088383/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- The beam of the OHT raft has been observed to be in an undulated shape. Rectification Status- Rectified | ||||||||||||
| 54 | 20086444 | BHALA W/S SCHEME (HFCL) | 20086444/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT Brace beam works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 55 | 20092082 | TARKA & AMAROPUR W/S SCHEME (HFCL) | 20092082/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Ring beam Steel binding is not found as per drawing. Stirrups of the beam not hold with main bar of the beam. Rectification Status- Rectified | ||||||||||||
| 56 | 20075253 | KHETAABPUR W/S SCHEME (HFCL) | 20075253/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT Plinth beam. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified | ||||||||||||
| 57 | 20073694 | MARDAN PUR W/S SCHEME (HFCL) | 20073694/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT Plinth beam . This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified | ||||||||||||
| 58 | 20087154 | BIJAHARA W/S SCHEME (HFCL) | 20087154/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT first brace beam of coloumn works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified | ||||||||||||
| 59 | 20100531 | HUSAYPUR W/S SCHEME (HFCL) | 20100531/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT first brace beam of column works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 60 | 20088554 | KARAMPUR W/S SCHEME (HFCL) | 20088554/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 61 | 20086381 | MALA KHURD W/S SCHEME (HFCL) | 20086381/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Torq Rench Calibration certificate not available during inspection. Observation- Provided | ||||||||||||
| 62 | 20088552 | M RAFI ALIAS SHIVDASPUR W/S SCHEME (HFCL) | 20088552/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- OHT Column steel found rusted. Anti rust chemical coating done | ||||||||||||
| 63 | 20086255 | CHITORA W/S SCHEME (HFCL) | 20086255/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- OHT Column steel found rusted. Anti Rust chemical Provided | ||||||||||||
| 64 | 20076400 | SHAHPUR & MURERA BUZURG W/S SCHEME (HFCL) | 20076400/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation-Rusted reinforcement steel was observed being used in the casting of the Overhead Tank (OHT) brace beams. The presence of corrosion on steel bars can adversely affect the bond strength with concrete and may compromise the structural integrity of the member Rectification Status- Rectified Observation- Anti Rust Chemical is applied on OHT GL column steel | ||||||||||||
| 65 | 20088316 | SIPARI W/S SCHEME (HFCL) | 20088316/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- The provided development length of reinforcement was found to be insufficient and does not meet the prescribed specifications, which may compromise the structural integrity and load transfer efficiency. Rectification Status- Rectified Observation- Length rectified | ||||||||||||
| 66 | 20092034 | GOVINDPUR W/S SCHEME (HFCL) | 20092034/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Main bars of brace beam are merged at junction box which are not fit according to drawing Rectification Status- Rectified Observation-Main bar of brace beam rectified | ||||||||||||
| 67 | 20100544 | AMABANSI W/S SCHEME (HFCL) | 20100544/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted reinforcement bars were being used in the Overhead Tank (OHT) construction. The use of corroded steel compromises the bond with concrete and adversely affects the structural strength and durability of the structure. Rectification Status- Rectified Observation- OHT new lot reinforcement column & beam ring used | ||||||||||||
| 68 | 20091456 | PATE PUR W/S SCHEME (HFCL) | 20091456/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Observation- The specified concrete cover of 50 mm was not maintained; only 25 mm cover was provided. This deviation from the design specification compromises durability and corrosion protection of the reinforcement, and must be rectified immediately. Rectification Status- Rectified Observation-50 MM cover block provided and rectified | ||||||||||||
| 69 | 20076123 | PAREWA W/S SCHEME (HFCL) | 20076123/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Observation- Rusted and corroded steel bars were being used for the OHT reinforcement work, which is against standard specifications and may compromise the structural integrity and durability of the structure. Rectification Status- Rectified Observation- Cement slurry is applied on OHT GL column steel | ||||||||||||
| 70 | 20097093 | NEWADAA W/S SCHEME (HFCL) | 20097093/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | tpi Observation- OHT column and plinth beam are not in proper alignment. Honeycomb observed in OHT Column and plinth beam area. | ||||||||||||
| 71 | 20097769 | AHLADPUR W/S SCHEME (HFCL) | 20097769/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Reinforcement bar overlapping has not been executed as per the specified standards. Improper lapping may compromise the structural strength and durability of the component. Rectification is necessary to ensure compliance with IS codes and design requirement Rectification Status- Rectified Observation-Plinth beam alignment rectified | ||||||||||||
| 72 | 20086199 | TARAW W/S SCHEME (HFCL) | 20086199/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- OHT Column steel found rusted. Rectification status -Anti rust chemical coated in reinforcement after instruction , but work not started in OHT Yet | ||||||||||||
| 73 | 20097760 | CIPAH W/S SCHEME (HFCL) | 20097760/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Overlapping found 400mm instead 800 at 1st brace beam Rectification Status- Overlap provided of 800mm | ||||||||||||
| 74 | 20091452 | MAKRSAN W/S SCHEME (HFCL) | 20091452/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- OHT Column steel found damage Condition Rectification Status- Anti rust coating done at reinforcement, but work not started yet | ||||||||||||
| 75 | 20088583 | DAULATPUR W/S SCHEME (HFCL) | 20088583/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- The reinforcement steel used in the OHT raft was found in a rusted condition, which is unacceptable as per standard construction practices and may affect the durability and bonding of concrete. Rectification Status- Rectified Observation- Anti rust chemical provided | ||||||||||||
| 76 | 20088191 | POOTA W/S SCHEME (HFCL) | 20088191/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Staggered bars were not used for lapping, which is against standard reinforcement practices.Spacing of Slab Steel Bars Not as per Approved Drawing Rectification Status- Beam of reinforcement dismantled, antirust chemical provided, but work not started yet | ||||||||||||
| 77 | 20100562 | PIPNAR W/S SCHEME (HFCL) | 20100562/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 78 | 20097088 | BELSAREE W/S SCHEME (HFCL) | 20097088/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT raft casting reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified | ||||||||||||
| 79 | 20073685 | KATGHRA W/S SCHEME (HFCL) | 20073685/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- Rusted steel was used in the OHT reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified | ||||||||||||
| 80 | 20092051 | TISAURI W/S SCHEME (HFCL) | 20092051/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation-. Rusted steel was used in the OHT Raft coloumn works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability 2. Rusted steel was used in the OHT Raft works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- 1- Rectified, 2- Rectified | ||||||||||||
| 81 | 20092071 | SADO PUR W/S SCHEME (HFCL) | 20092071/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Observation- .Rusted and corroded steel was used in the OHT coloumn reinforcement works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability Rectification Status- Rectified | ||||||||||||
| 82 | 20086408 | SARAI BAHADUR W/S SCHEME (HFCL) | 20086408/01 | No | No | No | No | No | No | No | Yes | No | No | No | No | No | Resolved | Observation- Net Soil Bearing capacity value is less than 8 Rectification- Two time and 2 agency Retest done by NABL Certified and value come more than 8 | ||||||||||||
| 83 | 20106928 | USIA W/S SCHEME (HFCL) | 20106928/01 | No | No | No | No | No | No | No | Yes | No | No | No | No | No | Resolved | Observation- Net Soil Bearing capacity value come less than 8. Rectification- Soil Bearing Capacity Re-test done by two agency NABL Certified Lab. and Rest came 8 for Zone B-3 | ||||||||||||
| 84 | 20088214 | MALEHUN W/S SCHEME (HFCL) | 20088214/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Observation- Cube Test Failure due to CTM error Rectification- NDT Test done and result found OK. | ||||||||||||