| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20062405 | KUNWAR KUNWARI | No | No | No | No | No | No | Yes | No | No | No | No | No | No | |||||||||||||||
| 2 | 20051270 | KHARWANIA, KUSMAHA | No | No | No | No | No | No | No | No | No | No | No | No | No | |||||||||||||||
| 3 | 20024714 | CHHAPIA CHITAUNA | No | Yes | No | No | No | No | No | No | No | No | No | No | No | |||||||||||||||
| 4 | 20049799 | RASAHARA | SKN-MEGHA-01 | Yes | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | Resolved | 1.Water source has been arranged for OHT work. 2.Cement bags have been replaced. | |||||||||||
| 5 | 20023409 | BASDEELA | 20023409/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Column demolished and reconstructed. | ||||||||||||
| 6 | 20023476 | SAMDA | 20023476/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. Replaced member. 2. Grinding of stair column and Grouting with GP2. | |||||||||||
| 7 | 20023413 | SANGATH | 20023413/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT Column demolished and reconstruct. | ||||||||||||
| 8 | 20026293 | RAKSA KOL | 20026293/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Grouting with GP2 and NDT rasuls found ok | ||||||||||||
| 9 | 20026324 | MEHDU PAR | 20026324/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Column demolished and reconstruct. | ||||||||||||
| 10 | 20038176 | BARGADWA KALAN | 20038176/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 11 | 20021690 | IMILIA | 20021690/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 12 | 20014375 | Jasawal | 20014375/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 13 | 20027850 | AGIAUNA | 20027850/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 14 | 20023323 | GOITHAHA | 20023323/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | 1. Precast Concrete elements found on site not in true Plumb whereas, Erection & Installation of Precast Concrete elements in correct & final position with proper line level and plumb at site. 2. Honeycomb found in concrete due to failure of the mortar to effectively fill the spaces among coarse aggregate particles | |||||||||||||
| 15 | 20017441 | Rasoolabad WSS | 20017441/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | ON Zinkulam Tank 1. Anchor bolts have not been properly secured. 2. Undersized nuts and bolts have been used to fix the Zincalume sheets, which is not in accordance with specifications. 3. Nut and bolt capping has not been installed. 4. Corroded nuts and bolts have been used in the tank installation, which may affect structural integrity. 5. Hole sizes are inconsistent and require rectification to ensure proper fitment. 6. Nuts and bolts have not been fully tightened, compromising joint stability. | |||||||||||||
| 16 | 20017447 | Rajapur Sarriaya WSS | 20017447/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | ||||||||||||||
| 17 | 8361542 | PUNYA GP WSS | 8361542/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | "1 The surface width of the cracks should not in general exceed 0.3 mm in members , Whereas here crack width is around 1.5 mm. 2 Large gaps between OHT slab and hold down bracket." | |||||||||||||
| 18 | 20038196 | DUDHARA BHITIA | 20038196/01 | No | No | Yes | No | Yes | No | No | No | No | No | No | No | No | Resolved | During testing it was found that the strength of the cube is less than the required value. Whereas Specified characteristic compressive strength of 150 mm cube at 28 days is 29 N/mm2 as per is 456: 2000. | ||||||||||||
| 19 | 20021663 | LEDWA SHRIPAL | 20021663/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | ||||||||||||||
| 20 | 20026350 | JAGDISHPUR | 20026350/01 | No | No | No | No | No | Yes | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 21 | 20026343 | PATTI BADGO HISSA SAMOGAR | 20026343/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 22 | 20026284 | KURWA | 20026284/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Oht top slab precast found cracks, honeycomb in staircase, Grouting of top slab not proper. | ||||||||||||
| 23 | 20014383 | Sukarauli | 20014383/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 24 | 20013283 | Parsa Pandey | 20013283/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 25 | 20029190 | EKMA DARUAJAPTI | 20029190/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 26 | 20051270 | KHARWANIA, KUSMAHA | 20051270/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | OHT Raft demolished and reconstruct. | ||||||||||||
| 27 | 20023118 | PACH POKHARI | 20023118/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT rest pass | ||||||||||||
| 28 | 20062405 | KUNWAR KUNWARI | 20062405/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT Stair case Alignment found incorrect on site whereas, all OHT components should be in correct & final position with proper line level and plumb at site | ||||||||||||
| 29 | 20024714 | CHHAPIA CHITAUNA | 20024714/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 30 | 20021917 | NIGHURI | 20021917/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | 1. Brick blast (crushed bricks) found in RCC precast column. 2. Precast Concrete elements found on site not in true Plumb whereas, Erection & Installation of Precast Concrete elements in correct & final position with proper line level and plumb at site. OHT Precast Staircase found on site not in true Plumb whereas, all OHT components should be in correct & final position with proper line level and plumb at site. | ||||||||||||