Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20086024 AINTHPUR, MARAUCHA, JJM SCHEME 20086024/01 No Yes No No No No No No No No No No No 1-Three OHT columns found misaligned, indicating deviation from vertical alignment tolerances.
2 20067778 Ambara ,Muda Bijurg JJM SCHEME 20067778/01 Yes Yes No No No No No No No No No No No 1-Major honeycombing observed in 1st brace beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 2-OHT column found misaligned (not in plumb), indicating deviation from vertical alignment.
3 20086187 DALRAJPUR JJM SCHEME LK062 No No Yes No No No No No No No No No No 1-During 28-day cube testing of M-30 grade concrete for the OHT slab at VTL laboratory, it was observed that 6 out of 9 cube specimens did not fall within the acceptance strength range, indicating failure of the cube test.
4 20032008 GHUNSI, MUNDAPASI & SEHARUWA JJM SCHEME 20032008/01 No Yes No No No Yes No No No No No No Yes 1-Ground Level (GL) brace beam of OHT found out of alignment and not in level. 2-OHT column has found misaligned (not in plumb), indicating deviation from vertical alignment tolerances. 3-Rust has formed on the nuts and bolts of the zinc aluminum tank, and some bolts at the tank base don't meet the clearance length specified in the drawing 4-Grouting is required at the base of the zinc tank because there is a gap between the slab and the wall sheet, and the slab is not level. 5-The zinc alum tank’s wall sheet is misaligned, with uneven bulging in and out. 6-The nut attached to the hold-down bracket is not tightened properly.
5 20096921 LAKHIMPUR DEHATJJM SCHEME 20096921/01 No No No Yes No No No No No No No No No 1-Column end reinforcement bars have not been properly bent and tied inside the OHT slab ring beam. As per site observations the column reinforcement had been cut and left above the slab top layer rebars, which is not in accordance with IS 456:2000 and IS 2502:1963 provisions for proper anchorage and continuity of reinforcement.
6 20086020 MAHANGAPUR JJM SCHEME 20086020/01 No Yes No No No Yes No No No No No No No 1-By visual inspection, OHT column appears to be not in proper alignment. 2-Water is leaking continuously from Zinc Aluminium tank of OHT. 3-Anchor volt needs to be attained. 2-Gap is observed in the hold down bracket and slab Surface. 3- The zinc alum tank’s wall sheet is misaligned, with uneven bulging in and out. 4-The nut bolt in DI pipe is rusting, it should be replaced with GI nut bolts 5-Rust has formed on the nuts and bolts of the zinc aluminum tank, and some bolts at the tank base don't meet the clearance length specified in the drawing 6-Grouting is required at the base of the zinc tank because there is a gap between the slab and the wall sheet, and the slab is not level.
7 20096947 MURAR KHEDA JJM SCHEME 20096947/01 No Yes No No No No No No No No No No No 1-Two OHT columns have been found misaligned (not in plumb) above 3rd brace beam, indicating deviation from vertical alignment.
8 20085812 SARPATAHA JJM SCHEME LK067 No No No No No Yes No No No No No No Yes 1-ZnAl tank grouting work below the ZAT supports and along the slab side has not been carried out. Anchor bolt length not specified as per drawing. 2-All anchoring bolts are in rusted conditions. It should be GI as per approved QAP and also clamping work not done in DI pipe. 3- Proper support not provided in washout DI pipe. 4- All anchoring bolts are in rusted conditions. It should be GI as per approved QAP.
9 20052130 TIHULIA & BAKKHARI JJM SCHEME 20052130/01 No Yes No No No Yes No No No No No No No 1- Zinc Alum OHT DI pipes nut bolts found rusted. Nut bolt properly not fixed in the roof sheet. 2- Bolts injecting in the Zinc Alum Tank sheet, it also should be rectified. 3- All anchoring bolts are in rusted conditions. It should be GI as per approved QAP. 4- provided support at the base of the Inlet, outlet, and overflow DI pipe 5- DI pipes are not clamping, due to not proper clamping during water supply its vibration will be mode and unsafe. 6- The zinc alum tank’s wall sheet is misaligned, with uneven bulging in and out. 7- Dust inside the tank should be clean. 8- Gap is observed in between the zinc tank sheet and the slab surface. 9-Two no’s Over Head Tank (OHT) columns have found misaligned (not in plumb), indicating deviation from vertical alignment.
10 20044249 UMARIYA & JIGANIYAN JJM SCHEME 20044249/01 No Yes No No No No No No No No No No No 1-By visual inspection, OHT columns appears to be not in proper vertical alignment.
11 20067537 Atariya JJM SCHEME 20067537/01 No Yes No No No No No No No No No No No Resolved
12 20096946 JAHANPUR, LAKHBAHOD JJM SCHEME 20096946/01 No No No No No No Yes No No No No No No Resolved
13 20096945 CHANDAN CHOWKI JJM SCHEME 20096945/01 No No No No No No Yes No No No No No No Resolved
14 20096816 GOVIND NAGAR COLONY LAK084 No No No No No No Yes No No No No No No Resolved
15 20067744 Manyaura ,Rukandipur JJM SCHEME 20067744/01 Yes No No No No No Yes No No No No No No Resolved Resolved
16 20024687 UMARA JJM SCHEME LK025 No No No No No No Yes No No No No No No Resolved
17 20067791 Kaprah JJM SCHEME 20067791/01 No No No No No No Yes No No No No No No Resolved
18 20096807 SISOURA JJM SCHEME LAK083 No No No No No No Yes No No No No No No Resolved
19 20038397 HARDUA & JATPURA JJM SCHEME 20038397/01 No No No No No No Yes No No No No No No Resolved
20 20052100 TENDUA & SHIVPUR SANDA JJM SCHEME 20052100/01 No No No No No No Yes No No No No No No Resolved
21 20028064 BANGALAHA TAKIYA JJM SCHEME LK041 No No No No Yes No Yes No No No No No No Resolved Resolved
22 20042246 BEHATA JJM SCHEME 20042246/01 No No No No No No Yes No No No No No No Resolved
23 20067297 Padariakalan JJM SCHEME LK060 No No No No No No Yes No No No No No No Resolved
24 20024270 BILHARI JJM SCHEME 20024270/01 No No No No No No Yes No No No No No No Resolved
25 20085805 BEIYARI JJM SCHEME LK068 Yes Yes No No No No No No No No No No No Resolved Resolved
26 20038288 GARDAHA JJM SCHEME 20038288/01 No No No No No No Yes No No No No No No Resolved
27 20096815 GULRA JJM SCHEME LAK082 No No No No No Yes No No No No No No No Resolved
28 20027375 JAMKOHNA JJM SCHEME LK031 No Yes No No No No No No No No No No No Resolved
29 20067527 Lagadahan,Paraspur JJM SCHEME 20067527/01 Yes No No No No No Yes No No No No No No Resolved Resolved
30 20095266 PIPARIYA DHANI JJM SCHEME 20095266/01 No No No No No No Yes No No No No No No Resolved
31 20052123 SONARIPUR & MALAKAPUR KALAN JJM SCHEME 20052123/01 No No No No No No Yes No No No No No No Resolved
32 20036622 BHADER & TAJPUR JJM SCHEME 20036622/01 No No No No No No Yes No No No No No No Resolved
33 20062907 Bhatpurwa Kalan & bhinjha JJM SCHEME 20062907/01 No No No No No No Yes No No No No No No Resolved
34 20086380 Chhatonia, Kakalapur JJM SCHEME 20086380/01 No No No No No No Yes No No No No No No Resolved
35 20101779 SAHASPUR JJM SCHEME 20101779/01 No No No No No No Yes No No No No No No Resolved
36 20067577 Sarsawa, Raulia JJM SCHEME 20067577/01 No No No No No No Yes No No No No No No Resolved
37 20067756 PipraKhurd ,Baibhahamunnu Singh , Gondhiya JJM SCHEME 20067756/01 No No No No No No Yes No No No No No No Resolved
38 20086601 GYANPUR, BALUDEEH JJM SCHEME 20086601/01 No No Yes No No No No No No No No No No Resolved
39 20042224 RATNAPUR JJM SCHEME 20042224/01 No No No No No No Yes No No No No No No Resolved
40 20035204 DAUDPUR JJM SCHEME LK045 No No No No No No Yes No No No No No No Resolved
41 20067549 Surat Nagar JJM SCHEME 20067549/01 No No No No No No Yes No No No No No No Resolved
42 20032004 PARSERA JJM SCHEME 20032004/01 No No No No No No Yes No No No No No No Resolved
43 20062856 Daulata Pur JJM SCHEME LK032 No No No No No No Yes No No No No No No Resolved
44 20024688 NAUSARJOGI JJM SCHEME 20024688/01 No No No No No No Yes No No No No No No Resolved
45 20042280 BAGIYA KHERA & MAJHOURA JJM SCHEME 20042280/01 No No No No No No Yes No No No No No No Resolved
46 20038420 CHANDAMAU JJM SCHEME 20038420/01 No No No No No No Yes No No No No No No Resolved
47 20086122 Amir Nagar & Paraspur JJM SCHEME 20086122/01 No No No No No No Yes No No No No No No Resolved
48 20021253 GANGAPUR GRANT JJM SCHEME 20021253/01 No No No No No No Yes No No No No No No Resolved
49 20027925 JEGNAHA KHANAPUR JJM SCHEME 20027925/01 No No No No No No Yes No No No No No No Resolved
50 20096806 KUTKHERWA JJM SCHEME LK074 No No No No No No Yes No No No No No No Resolved
51 20029763 SORJAPUR JUNGLE NO. 7 JJM SCHEME 20029763/01 No No No No No No Yes No No No No No No Resolved
52 20042266 BARKHERWA JJM SCHEME 20042266/01 No Yes No No No No No No No No No No No Resolved
53 20086180 NOBASTA JJM SCHEME 20086180/01 No No No No No No Yes No No No No No No Resolved
54 20024623 HARI NAGAR GRANT JJM SCHEME 20024623/01 No No No No Yes No Yes No No No No No No Resolved Resolved
55 20100226 KUNWARPUR KALAN JJM SCHEME 20100226/01 Yes Yes No No No No No No No No No No No Resolved Resolved
56 20086094 NIPANIYA JJM SCHEME 20086094/01 No Yes No No No No No No No No No No No Resolved
57 20038415 BEHDA MULTAN JJM SCHEME 20038415/01 No Yes No No No No No No No No No No No Resolved
58 20024689 ALLIPUR JJM SCHEME LK090 No No No No No No Yes No No No No No No Resolved
59 20100219 LALHA PUR RASULPUR JJM SCHEME LAK088 No No No No No No Yes No No No No No No Resolved
60 20031997 CHATHIA MEDINI JJM SCHEME 20031997/01 No No No No No No Yes No No No No No No Resolved
61 20028104 HARDWARI JJM SCHEME 20028104/01 No No No No No No Yes No No No No No No Resolved
62 20021268 GAUREYA JJM SCHEME LK040 Yes Yes No No Yes No No No No No No No No Resolved Resolved Resolved
63 20030274 RASOOLPUR JJM SCHEME LK056 No No No Yes No No No No No No No No No Resolved 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 12-14 months.
64 20029746 ASOUWA & SISNOUR JJM SCHEME LK089 No No No Yes No No No No No No No No No Resolved 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 10-12 months.
65 20052062 BABARPUR JJM SCHEME 20052062/01 No Yes No Yes No No No No No No No No No Resolved 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted above 1st brace beam . The construction work of OHT has been halted at 1st brace beam for approximately 10-12 months. 2-Two OHT columns have been found misaligned (not in plumb), indicating deviation from vertical alignment.
66 20042314 PRATAPPUR & PARSHERA KALAN JJM SCHEME 20042314/01 No No No No No No Yes No No No No No No Resolved
67 20096813 JANGLE NO 13 JJM SCHEME 20096813/01 Yes Yes No No No No Yes No No No No No No Resolved Resolved 1-Shuttering ply has been embedded between OHT Column and Tie beam junction. 2-Major honeycombing observed in brace beam of Overhead Tank (OHT), indicating poor compaction and workmanship. 3-Centre alignment discrepancy has been observed at the column and tie beam junction; the tie beam is not properly cantered on the column.
68 20067773 Allipur, Behta JJM SCHEME 20067773/01 No No No No No No Yes No No No No No No Resolved
69 20062891 Shahbuddinpur JJM SCHEME 20062891/01 No No No No No No Yes No No No No No No Resolved
70 20042302 LAGUCHA & SHIVPURI JJM SCHEME 20042302/01 No No No No No No Yes No No No No No No Resolved
71 20067666 Pakriya,Gulriya Rengwa JJM SCHEME 20067666/01 No No No Yes No No No No No No No No No Resolved 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 6-8 months.
72 20062871 Nari Behar JJM SCHEME LK037 No No No No No Yes Yes No No No No No No Resolved Resolved 1-ZnAl tank grouting work below the ZAT supports and along the slab side has not been carried out. 2-Leakage has been observed at the bottom slab side of the ZnAl tank. 3-The MS angle handrailing provided for the OHT walkway and staircase is heavily rusted. 4-Misalignment has been observed in the OHT washout DI pipe.
73 20062828 GAURA JJM SCHEME 20062828/01 No No No No No Yes No No No No No No Yes Resolved 1-ZnAl tank grouting work below the ZAT supports and along the slab side has not been carried out. 2-Misalignment has been observed in the OHT washout DI pipe. 3-Heavy rust has been observed on the nuts and bolts of the ZnAl tank. 4-OHT DI pipe has been installed without providing proper clamping.
74 20035700 KIRTAPUR & DEWAPUR JJM SCHEME 20035700/01 No No No No No Yes No No No No No No No Resolved 1-Zinc tank liner is found damaged.
75 20038770 PARASAN JJM SCHEME LK024 No No No No No No Yes No No No No No No Resolved
76 20086042 UDAIPUR MAHEWA JJM SCHEME LK069 No No No Yes No No No No No No No No No Resolved
77 20028049 BHADAURA JJM SCHEME 20028049/01 Yes Yes No No No No No No No No No No No Resolved 1-By visual inspection, OHT columns appears to be not in proper vertical alignment. 2-Major honeycombing has been observed in staircase waist slab of Overhead Tank (OHT), indicating poor compaction and workmanship.
78 20062818 AMBUPUR BAHARWA JJM SCHEME LK005 No No No No No Yes Yes No No No No No No Resolved Resolved 1-Visible structural crack seen in OHT walkway slab & staircase, indicating potential weakness. 2-Shuttering material has been found embedded at the column and beam junction. 3-The ZnAl tank grouting work has not been completed, and bulging has been observed on the tank surface.
79 20024490 BEHDA JJM SCHEME 20024490/01 No No No No No No Yes No No No No No No Resolved
80 20062826 MIDANIYA GARHI JJM SCHEME LK057 No Yes No No No No No No No No No No No Resolved
81 20067499 Koriya Loharama, Budheli Nankar , Jamunaha JJM SCHEME 20067499/01 No No No Yes No No No No No No No No No Resolved 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 10-12 months.
82 20086161 AGRA JJM SCHEME 20086161/01 No No No No No No Yes No No No No No No Resolved 1-Water stagnation was observed inside the OHT raft foundation. The agency engineer was clearly instructed to remove the accumulated water completely and proceed with concrete casting only after proper dewatering and inspection clearance. 2-Cover blocks were not placed properly at site. 3-Material test reports and approved drawing (hard copies) were not available at site during inspection. 4-During casting, the slump test was conducted twice; in the first test, the slump value was found to be 170 mm, whereas in the second test, zero slump was observed, which is also unsatisfactory. 5-It is a matter of serious concern that concrete casting of the OHT raft was carried out without rectification of the above observations and without inspection approval. Further, an RFI for column up to GL level was raised on 03 February 2026, which is procedurally incorrect and unacceptable, as the raft-related observations were not closed prior to proceeding with subsequent construction activities and all ongoing and further works are hereby stopped with immediate effect.
83 20086148 Dhundha Kalan,Jamdari JJM SCHEME 20086148/01 No Yes No No Yes No Yes No No No No No Yes Resolved Resolved 1-Two OHT columns have been found misaligned (not in plumb) above 2nd brace beam, indicating deviation from vertical alignment tolerances. 2-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. 3-Leakage has been observed in the ZnAl tank, and the tank nuts and bolts are found rusted.
84 20030236 HARDI & KHAGIYAPYR & KESHWAPUR KHURD JJM SCHEME 20030236/01 No Yes No No No No Yes No No No No No No Resolved 1-Visible structural crack seen in staircase and walkway slab, indicating potential weakness. 2-OHT column has been found misaligned (not in plumb), indicating deviation from vertical alignment.
85 20096814 KHAMAREYA JJM SCHEME LAK081 No Yes No No No No Yes No No No No No No Resolved 1-Two no’s Over Head Tenk (OHT) columns have found misaligned (not in plumb), indicating deviation from vertical alignment. 2-The Zn-Al storage tank grouting work has not been executed, resulting in improper anchorage and potential instability.
86 20028089 MUNJHA JJM SCHEME 20028089/01 No Yes No No No No Yes No No No No No No Resolved 1-The ring beam of Overhead Tank (OHT) is misaligned, and constructed level is not as per approved drawing. 2-The Zn-Al storage tank grouting work has not been executed, resulting in improper anchorage and potential instability.
87 20067704 Sikatia Rumwapur,Mohamadpur JJM SCHEME 20067704/01 No No No No No No Yes No No No No No Yes Resolved 1-Despite clear instructions to replace oversized material and to conduct mandatory material testing before casting, the contractor neither replaced nor tested the material. Further, slab casting was carried out without material testing and without prior intimation, which amounts to gross negligence, deliberate violation of specifications, and breach of contractual obligations. 2-In the event of any structural failure in future arising from this OHT, the entire responsibility shall rest solely with the contractor agency.
88 20096943 SURJANPUR JJM SCHEME LK021 No No No No Yes Yes Yes No No No No No Yes Resolved Resolved Resolved 1-Heavy rust has been observed on the nuts and bolts of the ZnAl tank. 2-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer.
89 20067337 Mahurena & Kakori JJM SCHEME 20067337/01 No No No Yes No No Yes No No No No No No Resolved Resolved 1-Projected rebars in Overhead Tank (OHT) Column were found heavily rusted. The construction work of OHT has been halted at ground level for approximately 10-12 months. 2-The pump house veranda slab has found sag down or bend indicates poor workmanship or waterlogging.
90 20096948 BAMNAGAR JJM SCHEME 20096948/01 No No No No Yes No No No No No No No No Resolved 1-Deviation in the cross-section size of column and beam at junctions below slab level, which may adversely affect structural alignment and load transfer.
91 20052127 BHADEHIA JJM SCHEME LK047 No No No No Yes No No No No No No No No Resolved 1-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer.
92 20035206 DURGAPUR PADARI JJM SCHEME LK043 No No No No Yes Yes No No No No No No Yes Resolved Resolved 1-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. 2-ZnAl tank nuts and bolts are found rusted.
93 20024685 MOHBATEYA BEHAD JJM SCHEME 20024685/01 No Yes No No Yes No No No No No No No Yes Resolved 1-By visual inspection, OHT column appears to be not in proper alignment. 2-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer.
94 20067157 RAY PUR JJM SCHEME LK029 No Yes No No Yes No No No No No No No No Resolved 1-By visual inspection, OHT column appears to be not in proper alignment. 2-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer.
95 20035978 SAMARDAHARI JJM SCHEME LK020 No No No No Yes No Yes No No No No No No Resolved Resolved 1-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. 2-OHT staircase 5th lift landing beam width and height have not been constructed as per approved drawing.
96 20062851 Lakhpera & Khanwapur JJM SCHEME 20062851/01 No No No No Yes No Yes No No No No No Yes Resolved Resolved 1-Deviation observed in cross-section size of column & beam at junctions compared to approved drawings, which may affect structural alignment and load transfer. 2-The staircase 3rd landing beam slab area surface has not been finished to proper level, and uneven slope.
97 20067163 Choraha JJM SCHEME 20067163/01 Yes Yes No No No No Yes No No No Yes No No Resolved Resolved Resolved Resolved
98 20096810 SURKHANA PURAB JJM SCHEME LK077 Yes Yes No No No No No No No No Yes No No Resolved Resolved Resolved
99 20028057 MIRZAGANJ & KATAHEYA JJM SCHEME 20028057/01 Yes Yes No No No No No No No No Yes No No Resolved Resolved Resolved