Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20070441 DARIGAPUR WATER SUPPLY Merge SCHEME 20070441/01 Yes No No No No No No No No No No No No Significant honeycombing has been found on the OHT structure
2 20069346 ONAIY JANGAL WATER SUPPLY SCHEME 20069346/01 No Yes No No No No No No No No No No No lt has been observed that the column above 1't brace beams have undergone extensive repairs and are misaligned.
3 20067268 SEWALPUR WATER SUPPLY SCHEME 20067268/01 Yes No No No No No No No No No No No No Steel reinforcement is exposed at the bottom of the OHT 3rd brace beam, and honeycombing is also observed in the concrete, which may affect durability and structural performance.
4 20065980 HARDI Water Supply Scheme 20065980/01 No No No No No No Yes No No No No No No Due to prolonged stoppage of work and the presence of a nearby high-tension electrical line, rusting has been observed on the reinforcement of the OHT columns. This condition poses both quality and safety concerns
5 20078774 KRISHNAPUR TALA WATER SUPPLY SCHEME 20078774/01 No Yes No No No No No No No No No No No From visual inspection,2 nos of columns appears to be misaligned.
6 20069484 KEWALPUR MAFI WATER SUPPLY MERGE SCHEME 20069484/01 No Yes No No No No No No No No No No No From visual inspection, the column appears to be misaligned. The change in its profile and the eccentricity near the beam connection suggest that the column may not be perfectly vertical or centered.
7 20067405 JASUALI WATER SUPPLY SCHEME 20067405/01 No No No Yes No No No No No No No No No Reinforcement bars are exposed in slab and slab beam.
8 20068493 DHURAYEE WATER SUPPLY SCHEME 20068493/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications
9 20059073 Ranapur Urf Pahrauli WATER SUPPLY SCHEME 20059073/01 No No No No Yes No No No No No No No No Resolved Rectification has been carried out by dismantling the incorrect lap locations and correcting the lapping positions as per approved drawings. Rusted reinforcement bars were properly cleaned, and Nito Zinc Primer was applied before restarting the work.
10 20092603 ATARHAR WSS 20092603/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications
11 20067443 CHAUNIYA WATER SUPPLY SCHEME 20067443/01 No No Yes No No No No No No No No No No Resolved An Ultrasonic Pulse Velocity (UPV) test was conducted in the presence of the TPIA representative, and the results were found to be satisfactory, confirming the quality and integrity of the repaired concrete.
12 20098506 GHURHAT WSS 20098506/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications
13 20066012 BAGAHA Water Supply Scheme 20066012/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications
14 20059849 LODIPUR WATER SUPPLY SCHEME 20059849/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications.
15 20059882 KAHUWA WATER SUPPLY SCHEME 20059882/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications
16 20059630 SAWAYYA RAJE WATER SUPPLY SCHEME 20059630/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications.
17 20066009 ATAURA KHURD Water Supply Scheme 20066009/01 No Yes No No No No No No No No No No No Resolved Rectification has been carried out by dismantling the misaligned portions of the brace beams and reconstructing them as per the approved drawings and required alignment. Necessary quality checks were performed during reconstruction, and the overall alignment of the brace beams is found satisfactory.
18 20059173 KALIKPUR KALA WATER SUPPLY SCHEME 20059173/01 No No No No No No Yes No No No No No No It was observed that the stair flight was cut during the installation of the Dl pipe, but the damaged portion has not been repaired. The Gl pipe joint appears cracked/damaged at the threaded connection and the supporting MS angle shows significant rusting, indicating improper joint fixing and lack of protective coating. The beam is not aligned properly due to incorrect shuttering placement, resulting in visible deviation from the intended alignment
19 20098488 VISHUN PUR WSS 20098488/01 No No Yes No No No No No No No No No No Resolved An Ultrasonic Pulse Velocity (UPV) test was conducted in the presence of the TPIA representative, and the results were found to be satisfactory, confirming the quality and integrity of the repaired concrete.
20 20093254 BHAWANIPUR1 Water Supply Scheme 20093254/01 No No No No No No Yes No No No No No No Resolved 1.The reinforcement bars were thoroughly cleaned using wire brushes to remove loose rust, scale, and foreign materials. 2.After proper surface preparation, Nito Zinc Primer was applied as per manufacturer’s specifications.
21 20078815 BAIRAMPUR WATER SUPPLY MERGE SCHEME 20078815/01 No Yes No No No No No No No No No No No Resolved Dismantling of OHT Columns work in progress.
22 20059703 RAJAPUR CHAK BIBI WATER SUPPLY SCHEME 20059703/01 No Yes No No No No No No No No No No No Significant honeycombing has been observed in the OHT Column and Cracks were found in the column, and it appears to have been repaired. Additionally, the column size does not match the dimensions shown in the drawing
23 20059187 Khanpur Urf Birbhanpur WATER SUPPLY SCHEME 20059187/01 No Yes No No No No No No No No No No No The alignment of one column was not found in plumb .
24 20058996 KAIRAWA WATER SUPPLY SCHEME 20058996/01 Yes No No No No No No No No No No No No Resolved Honeycombing was repaired by applying Nitobond as a bonding agent, filling cavities with Conbextra GP2. 2.After proper curing, an Ultrasonic Pulse Velocity (UPV) test was conducted
25 20093314 BAHERAWA Water Supply Scheme 20093314/01 Yes No No No No No No No No No No No No Resolved Honeycombing was repaired by applying Nitobond as a bonding agent, filling cavities with Conbextra GP2. 2.After proper curing, an Ultrasonic Pulse Velocity (UPV) test was conducted
26 20065908 THULWASA Water Supply Scheme 20065908/01 Yes No No No No No No No No No No No No Resolved 1. Honeycombing was repaired by applying Nitobond as a bonding agent, filling cavities with Conbextra GP2. 2.After proper curing, an Ultrasonic Pulse Velocity (UPV) test was conducted.
27 20059726 MAJHIGAVAN KARAN WATER SUPPLY SCHEME 20059726/01 No No No Yes No No No No No No No No No Resolved 1. Honeycombing was repaired by applying Nitobond as a bonding agent, filling cavities with Conbextra GP2. 2.After proper curing, an Ultrasonic Pulse Velocity (UPV) test was conducted.
28 20074530 GODWARA Water Supply Scheme 20074530/01 No No No No No Yes No No No No No No No Resolved The leakage observed in the Zinc–Alum water storage tanks has been successfully rectified. All seepage points were identified and repaired by tightening/replacing bolts, installing new neoprene/rubber washers, and applying food-grade internal sealant and external waterproof sealant to the affected joints. Stagnant water around the tank base was removed, the slab surface was cleaned and restored, and necessary waterproofing was carried out to prevent future seepage.