Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20066459 DHAMAUR KHAS 20066459/01 No No No No No No No Yes No No No No No SBC value obtained found less than design load value.
2 20013221 Amhit 20013221/01 Yes No No No Yes No No No No No No No No Resolved Resolved
3 20020891 Bhakura 20020891/01 Yes No No No No No No No No No No No No Resolved
4 20020923 Jamunipur 20020923/01 No No No No No No Yes No No No No No No Resolved
5 20020928 Jarauta 20020928/01 Yes No No No Yes No Yes No No No No No No Resolved Resolved Resolved
6 20011010 Kaserawa 20011010/01 Yes No No No No No Yes No No No No No No Resolved Resolved
7 20020884 Kusumahi 20020884/01 Yes No No No No No Yes No No No No No No Resolved Resolved
8 20020909 Rajamalpur 20020909/01 Yes No No No No No Yes No No No No No No Resolved Resolved
9 20020866 Kabiruddinpur 20020866/01 Yes No No No No No No No No No No No No Resolved
10 20067683 Nikarozpur 20067683/01 Yes No No No No No No No No No No No No Resolved
11 20022188 Ibrahimabad 20022188/01 Yes No No No No No No No No No No No No Resolved
12 20013733 Bagthari 20013733/01 No No No Yes No No Yes No No No No No No Resolved Resolved
13 20017824 Bhuili 20017824/01 Yes No No No No No No No No No No No No Resolved
14 20020927 Kerwari 20020927/01 Yes No No No No No Yes No No No No No No Resolved Resolved
15 20013327 Faridabad 20013327/01 Yes No No No No No No No No No No No No Resolved
16 20010966 Gandhaunna 20010966/01 Yes No No No No No No No No No No No No Resolved
17 20021061 Baghnari 20021061/01 No No No No No No Yes No No No No No No Resolved
18 8362137 JANGIPUR 8362137/01 No No No No No No Yes No No No No No No Resolved
19 20010934 Belapar 20010934/01 Yes No No No No No No No No No No No No Resolved
20 20068487 Sarai Mohiuddenpur 20068487/01 No No No No No No Yes No No No No No No Resolved
21 20067662 Mani Kalan 20067662/01 No No No No No No Yes No No No No No No Resolved
22 20011145 Ramgrah Khas 20011145/01 No No No No No No Yes No No No No No No Resolved
23 20011681 Dharanw(Multi GP) 20011681/01 No No No No No No Yes No No No No No No Resolved
24 20020920 Arowan 20020920/01 No No No No No No Yes No No No No No No Resolved
25 20011033 Tarahathi 20011033/01 No No No No No No Yes No No No No No No Resolved
26 20066888 Bhiduna 20066888/01 No No No No No No No No No Yes No No No 1. During inspection OHT Raft found totally cracked due to mix ratio not maintained and settled it should be demolished and reconstructed again with proper RFI and good quality of work.2. Rusted steel bars found in constructed OHT Raft due to work stopped from many days it must be removed and reuse proper steel bar in Raft.
27 20057178 Sarai Durga Das 20057178/01 No No No No No No No No Yes No No No No 1. During inspection work stopped since 6months and steel bar cut by local villagers which is effect the work executed as per design and drawing and due to this issue laping zone not maintain in column work it must be demolished and reconagain. 2.During inspection work stopped since 6months and steel bar found rusted which is effect the work the quality of work it must be reconstruct again
28 20021186 Salempur 20021186/01 No No No No No No Yes No No No No No No During inspection Oht work stopped since 6 months due to which rusted steel bar found at site.
29 20016242 Rampur Ta Jakhaniyan 20016242/01 No No No No Yes No No No No No No No No It has been observed that the brace beam has not been constructed in accordance with the approved drawings and specifications. Discrepancies observed dimensions of beam not constructed in centre of column which is mention in drawing, This deviation from the design could potentially affect the structural integrity and overall performance of the foundation. Immediate corrective action is recommended to Dismantle or engage reputed Government engineering college/IIT expert to investigate the stability of the structure.
30 20011133 Singhawal 20011133/01 No No No No No No Yes No No No No No No Hammering in OHT (Overhead Tank) for outlet, inlet, drainage, and overflow pipes requires extra caution to avoid compromising the structural strength. It's essential to use suitable methods and tools to prevent damage and ensure the tank's integrity.
31 20089689 Jamuniya 20089689/01 No No No No No No No Yes No No No No No SBC obtained less than design load..
32 20009890 SADANPUR 20009890/01 Yes No No No No No No No Yes No No No No Resolved Resolved
33 20020863 Alishahpur 20020863/01 No No No No Yes No Yes No Yes No No No No Resolved Resolved Resolved
34 20015817 Zasopur 20015817/01 No No No No Yes No Yes No Yes No No No No Resolved Resolved Resolved
35 20022199 Murela 20022199/01 Yes No No No No No No No Yes No No No No Resolved Resolved
36 20057136 Sauraeya 20057136/01 No No No No No No Yes No No No No No No 1. Finishing work/concreting work found not satisfactory recommended to finish as per specification also recommended to perform NDT/UPV test. 2. Crack observed in raft beam recommended to finish crack as per approved methology provided by SWSM after that NDT/UPV test must be conducted in presence of TPIA staff.
37 20089692 Sulatanpur Gaur 20089692/01 No No No Yes No No Yes No No No No No No 1. Due to long time exposure of reinforcement of raft bar got rusted recommended to clean reinforcement bar as per SWSM guideline. 2. Dust found in 10mm aggregate recommended to perform all aggregate related test as per approved QAP. in presence of TPIA representative.
38 20011593 Shahpur 20011593/01 Yes No No No No No No No No No No No No Resolved
39 20089194 Kurni 20089194/01 No No No Yes Yes No No No No No No No No Resolved Resolved Compliance done.
40 20022217 Bambawan 20022217/01 No Yes No No No No No No No No No No Yes Resolved River connected pond which passes thorough near campus area during rainy season nallah flow corrode the bank soil which may damage our campus.
41 20065206 Bhairopur 20065206/01 No No No No No No Yes No No No No No Yes Resolved constructed OHT (GL level) situated at the edge of depression area during rainy season water filled in that area also corrode of soil may be seen which may damage/corrode backfilled soil where OH situated.
42 20012953 Sehara 20012953/01 Yes No No No No No Yes No No No No No No Resolved Resolved Compliance done.
43 20020914 Udpur Ghatampur 20020914/01 No No No No No No No No Yes No No No No Not complied.
44 20020916 Mojra 20020916/01 No No No Yes No No No No No No No No No Resolved Compliance done.
45 20021070 Ibrahimpur 20021070/01 No No No Yes No No No No No No No No No Not complied.