| 1 |
Lalitpur |
20099699 |
LAKHANGER VILLAGE WATER SUPPLY SCHEME |
NEW RETROFIT |
Jal Nigam |
YES |
NO |
NO |
69.99 |
0.30 |
0.30 |
0.00 |
69.70 |
69.99 |
Under Construction |
30.00 |
"• The scheme is located in Madawara Block and covers a single village under the Solar Dual Pump and New Retrofitting categories(left out village)
• The scheme is currently completely non-functional.
• The borewell has been completed, while installation of the pump, motor and solar system is still pending.
• The target has been set to make the scheme functional by 31 October."
|
| 2 |
Lalitpur |
20102391 |
PAPRO VILLAGE WATER SUPPLY SCHEME |
NEW RETROFIT |
Jal Nigam |
YES |
NO |
NO |
21.18 |
0.00 |
0.00 |
0.00 |
21.18 |
21.18 |
Under Construction |
40.00 |
"• The scheme is located in Madawara Block and covers a single village under the Solar Dual Pump and New Retrofitting categories.(left out village)
• The target has been set to complete the scheme by 31 October.
• The proposed borewell has been completed.
• Installation of the solar dual-pump system is pending.
• Laying of 400 m of distribution pipeline is pending.
• All 22 FHTC connections are pending.
• The required materials have been received at the site.
|