S.No. District Scheme ID Scheme Name Program Name Department PWS Exist Physical Completion Financial Completion Work Cost Released Cost Expenditure Cost Liability Balance Fund Final Cost Scheme Status Physical Progress(%) Remark
1 Lalitpur 20099714 JAITUPURA VILLAGE WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 68.30 6.56 6.56 0.00 61.74 68.30 Under Construction 82.00 "• The scheme is located in Madawara Block and covers one village under the tubewell-based New Retrofitting category.(left out village) • The target has been set to complete the scheme by 20 October • pending bill is 5.42 lakhs. • The proposed borewell has been completed, and the pump house has been constructed. • Pump lowering and solar system installation are still pending. • Against the target of 60 FHTCs, all 60 FHTCs remain pending. • During the current week, 800 metres of pipeline has
2 Lalitpur 20099746 BADWAR VILLAGE WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 89.29 19.24 19.24 0.00 70.05 89.29 Under Construction 85.00 "• The scheme is located in Madawara Block and covers one village under the tubewell-based New Retrofitting category.(left out village) • Out of the total 4.50 km distribution pipeline, 3.00 km has been laid and 1.50 km remains pending. • Pipeline testing is 100% pending. • All 192 FHTCs are yet to be completed. • The pump house civil work has been completed, while motor installation and solar system installation are pending. • All 3 proposed borewells have been completed, and pipe lowering work
3 Lalitpur 20099749 KURRAT VILLAGE WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 135.10 18.40 18.40 0.00 116.70 135.10 Under Construction 90.00 "• The scheme is located in Madawara Block and covers a single village under the Solar Dual Pump and New Retrofitting categories.(left out village) • The agency has set a target to complete the remaining work by 15 October. • in scheme have labiity of bill amount is 29.04 lakhs • The tank structure has been completed, while painting work is pending. • The entire 400 m raising main was completed last week. • Out of the two pump houses, one has been completed and is functional, while construct