| 1 |
8177125 |
RETROFITTING OF BASOD W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Basaud |
392092 |
Basaud |
Non-functional |
0.00 |
100.00 |
No |
58.94000 |
54.46600 |
45.89000 |
45.89000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 2 |
8180245 |
RETROFITTING OF DHIKOLI W/S SCHEME |
2020-2021 |
Retrofit |
Ongoing |
Baghpat |
Pilana |
Dhikoli |
392128 |
Dhikoli |
Functional |
65.00 |
100.00 |
Yes |
88.32000 |
62.97000 |
36.57000 |
32.29000 |
4.31000 |
OLD RETROFIT |
Bill amount of Rs. 4.31 Lakh uploaded on 24-06-2024, but rejected on dt.07-12-2024 it again uploaded on date-23-01-2025 and get approved in RF-8 on date-27-03-2025 but payment not received to contractor till now. |
| 3 |
8361490 |
RETROFITTING OF BILOCHPURA WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Bilochpura |
392091 |
Bilochpura |
Functional |
78.00 |
100.00 |
No |
27.49000 |
22.82000 |
22.79000 |
22.79000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 4 |
8177032 |
RETROFITTING OF PURA MAHADEV W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
PURA |
392102 |
PURA MAHADEV |
Functional |
80.00 |
100.00 |
Yes |
34.73000 |
31.81400 |
29.77000 |
29.77000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 5 |
8180314 |
RETROFITTING OF JIWANA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
JIWANA |
392040 |
JIWANA GULIAN |
Functional |
60.00 |
100.00 |
No |
75.12000 |
57.44800 |
57.44000 |
57.44000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 6 |
8361356 |
RETROFITTING OF MAVIKALA WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Mawi Kalan |
392039 |
Mawi Kalan |
Functional |
75.00 |
100.00 |
No |
47.45000 |
44.94000 |
43.24000 |
43.24000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 7 |
8178593 |
RETROFITTING OF RANCHHAR W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Ranchhar |
392012 |
Ranchhar |
Functional |
60.00 |
100.00 |
No |
25.01000 |
24.05400 |
22.82000 |
22.82000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 8 |
8178626 |
RETROFITTING OF TERA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Tera |
392032 |
Tera |
Functional |
70.00 |
100.00 |
No |
15.67000 |
14.95800 |
14.93000 |
14.93000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 9 |
8178511 |
RETROFITTING OF HALALPUR W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Chhaprauli |
Mukandpur |
391923 |
Mukandpur |
Functional |
85.00 |
100.00 |
No |
55.77000 |
43.47700 |
43.68000 |
43.68000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 10 |
8178397 |
RETROFITTING OF LOYAN W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Loyan |
391949 |
Loyan |
Functional |
82.00 |
100.00 |
No |
44.87000 |
36.90700 |
36.20000 |
36.20000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 11 |
8177140 |
RETROFITTING OF BINAULI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Binauli |
392022 |
Binauli |
Functional |
68.00 |
100.00 |
No |
24.07000 |
23.48000 |
23.46000 |
23.46000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 12 |
8178380 |
RETROFITTING OF KOTANA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Kotana |
391957 |
Kotana |
Functional |
55.00 |
100.00 |
No |
68.94000 |
56.53000 |
56.50000 |
56.50000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 13 |
8180264 |
RETROFITTING OF HILWARI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Hilwari |
391979 |
Hilwari |
Functional |
69.00 |
100.00 |
No |
66.32000 |
50.20000 |
5.38000 |
5.38000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 14 |
8375766 |
RETROFITTING OF BAMNAULI W/S SCHEME |
2020-2021 |
PWS |
Ongoing |
Baghpat |
Binauli |
Bamnauli |
392010 |
Bamnauli |
Functional |
70.00 |
100.00 |
No |
64.61000 |
61.49000 |
61.49000 |
61.49000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 15 |
8176966 |
RETROFITTING OF FAZALPUR W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Fazalpur |
392028 |
Fazalpur |
Non-functional |
0.00 |
100.00 |
No |
39.27000 |
33.88000 |
27.36000 |
27.36000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 16 |
8178618 |
RETROFITTING OF SIRSALI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Sirsali |
392011 |
Sirsali |
Functional |
80.00 |
100.00 |
No |
27.68000 |
23.06000 |
22.98000 |
22.98000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 17 |
8180444 |
RETROFITTING OF PALRI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Palri |
392007 |
Palri |
Functional |
85.00 |
100.00 |
Yes |
21.42000 |
16.33000 |
16.65000 |
14.18000 |
2.47000 |
OLD RETROFIT |
Token No- 78205 and Bill amount of Rs. 2.47 Lakh uploaded on 29-03-2022, but rejected on dt.-31-03-2022 it again uploaded on date-11-10-2022, and get approved in RF-13 on date-27-06-2023 but payment not received to contractor till now. |
| 18 |
8180433 |
RETROFITTING OF NIRPURA W/S SCHEME |
2020-2021 |
Retrofit |
Ongoing |
Baghpat |
Binauli |
Nirpura |
391988 |
Nirpura |
Functional |
0.00 |
100.00 |
Yes |
77.01000 |
54.19000 |
33.36000 |
33.36000 |
5.03000 |
OLD RETROFIT |
Token No- 94150 and Bill amount of Rs. 5.03 Lakh uploaded on 15-04-2024, but rejected on dt.-14-09-2024 it again uploaded on date-04-09-2025 but not approved till now. |
| 19 |
8180330 |
RETROFITTING OF KOORI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Chhaprauli |
Koori |
391907 |
Koori |
Functional |
62.00 |
100.00 |
No |
63.31000 |
60.48000 |
60.43000 |
60.43000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 20 |
8177003 |
RETROFITTING OF HISAWDA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Hisawada |
392100 |
Hisawada |
Functional |
65.00 |
100.00 |
No |
61.40000 |
51.67500 |
49.11000 |
49.11000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 21 |
8178879 |
RETROFITTING OF BARANAWA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Baranawa |
392018 |
Baranawa |
Functional |
75.00 |
100.00 |
No |
52.40000 |
41.24600 |
41.23000 |
41.23000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 22 |
8199566 |
Luhara pilana retrofitting water supply scheme |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Luhara |
392137 |
Luhara |
Non-functional |
0.00 |
100.00 |
No |
50.37000 |
40.01000 |
23.34000 |
23.34000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 23 |
8361349 |
RETROFITTING OF SINGHAWALI AHIR WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Singhaoli Ahir |
392106 |
Singhaoli Ahir |
Functional |
75.00 |
100.00 |
No |
58.56000 |
55.98400 |
47.44000 |
47.44000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 24 |
8178346 |
RETROFITTING OF KHATTA PRHLADPUR W/S SCHEME |
2020-2021 |
Retrofit |
Ongoing |
Baghpat |
Pilana |
KHATTA PRAHLADPUR |
392122 |
Khatta Prahladpur |
Functional |
75.00 |
100.00 |
No |
85.91000 |
83.64100 |
80.10000 |
80.10000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 25 |
8180411 |
RETROFITTING OF LUHARI W/S SCHEME |
2020-2021 |
Retrofit |
Ongoing |
Baghpat |
Baraut |
Luhari |
391963 |
Luhari |
Functional |
73.00 |
100.00 |
Yes |
78.86000 |
56.18000 |
32.29000 |
32.29000 |
17.71000 |
OLD RETROFIT |
Token No- 89437 and Bill amount of Rs. 17.70 Lakh uploaded on dt-18-05-2024, but rejected on dt.-19-06-2024 it again uploaded on date-11-06-2024 but rejected again on dt- 23-11-2024 it again upload on dt-23-12-2024 and get approved in RF-01 on date-22-05-2025 but payment not received to contractor till now. |
| 26 |
8178362 |
RETROFITTING OF KHINDORA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Khindora |
392096 |
Khindora |
Functional |
80.00 |
100.00 |
No |
40.56000 |
39.04000 |
38.66000 |
38.66000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 27 |
8176936 |
RETROFITTING OF ASARA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Chhaprauli |
Asara |
391911 |
Asara |
Functional |
60.00 |
100.00 |
No |
65.50000 |
61.81000 |
61.80000 |
61.80000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 28 |
8177059 |
RETROFITTING OF PUSAR W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Pusar |
392008 |
Pusar |
Functional |
70.00 |
100.00 |
No |
38.99000 |
33.87000 |
33.47000 |
33.47000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 29 |
8361339 |
RETROFITTING OF PANCHI WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Panchi |
392129 |
Panchi |
Functional |
80.00 |
100.00 |
No |
39.83000 |
38.50700 |
36.36000 |
36.36000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 30 |
8361333 |
RETROFITTING OF NIROJPUR GURJAR WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
BAGHPAT |
NOROZPUR GOORJAR |
392073 |
NOROZPUR GOORJAR |
Functional |
81.00 |
100.00 |
No |
35.88000 |
30.02000 |
29.98000 |
29.98000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 31 |
8361322 |
RETROFITTING OF SONTHI WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Chhaprauli |
Sothi |
391924 |
Sothi |
Functional |
85.00 |
100.00 |
No |
12.62000 |
11.51400 |
11.52000 |
11.52000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 32 |
8180292 |
RETROFITTING OF KATHA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Khekara |
Katha |
392140 |
Katha |
Functional |
72.00 |
100.00 |
No |
50.79000 |
39.96300 |
39.93000 |
39.93000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 33 |
8178337 |
RETROFITTING OF FEZULLAPUR W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
BAGHPAT |
FAIZULLAPUR |
392050 |
FAIZULLAPUR |
Functional |
80.00 |
100.00 |
No |
20.00000 |
18.90000 |
18.80000 |
18.80000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 34 |
8361359 |
RETROFITTING OF TITRAUDA WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Binauli |
Titrouda |
392029 |
Titrouda |
Functional |
75.00 |
100.00 |
No |
16.16000 |
14.24000 |
13.98000 |
13.98000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 35 |
8178606 |
RETROFITTING OF SABGA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Shabga |
391951 |
Shabga |
Functional |
55.00 |
100.00 |
No |
61.36000 |
50.45900 |
49.92000 |
49.92000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 36 |
8194226 |
RETROFITTING OF LUHARA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Luhara |
392137 |
Luhara |
Functional |
60.00 |
100.00 |
No |
43.35000 |
33.63000 |
0.00000 |
0.00000 |
3.00000 |
OLD RETROFIT |
|
| 37 |
8361374 |
RETROFITTING OF SUNHERA WATER SUPPLY SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Khekara |
Sunehra |
392142 |
Sunehra |
Functional |
0.00 |
100.00 |
No |
53.31000 |
51.23000 |
50.40000 |
50.40000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 38 |
8176872 |
RETROFITTING OF GURANA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Gurana |
391975 |
Gurana |
Functional |
65.00 |
100.00 |
No |
47.95000 |
41.37000 |
42.54000 |
42.54000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 39 |
8180212 |
RETROFITTING OFDHIKANA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Dhikana |
391962 |
Dhikana |
Functional |
75.00 |
100.00 |
No |
58.88000 |
45.15000 |
45.14000 |
45.14000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 40 |
8177021 |
RETROFITTING OF PAWLA BEGMABAD W/S SCHEME |
2020-2021 |
Retrofit |
Ongoing |
Baghpat |
BAGHPAT |
PAWLA BEGMABAD |
392090 |
PAWLA BEGMABAD |
Functional |
80.00 |
100.00 |
Yes |
62.65000 |
60.20000 |
11.13000 |
11.13000 |
39.07000 |
OLD RETROFIT |
Token No- 97446 and Bill amount of Rs. 39.06 Lakh uploaded on Dt.- 27-11-2025 |
| 41 |
8178598 |
RETROFITTING OF SADHIKPUR SINOLI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Sadakpur Sinoli |
391952 |
Sadakpur Sinoli |
Functional |
70.00 |
100.00 |
No |
71.53000 |
69.20700 |
65.09000 |
65.09000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 42 |
8180200 |
RETROFITTING OF DAULA W/S SCHEME |
2020-2021 |
Retrofit |
Ongoing |
Baghpat |
Pilana |
Daula |
392094 |
Daula |
Functional |
60.00 |
100.00 |
Yes |
142.25000 |
136.77000 |
116.03000 |
85.09000 |
37.87000 |
OLD RETROFIT |
Token No- 94720 and Bill amount of Rs. 31.02 Lakh uploaded on 29-11-2024, but rejected on dt.14-04-2024 it again uploaded on date-29-11-2024 and get approved in RF-7, on date-03-02-2025 but payment not received to contractor till now.
Token No- 97339 and 2nd Bill amount of Rs. 6.85 Lakh uploaded on 15-10-2025, but not approved till now. |
| 43 |
8180191 |
RETROFITTING OF BASOLI W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Chhaprauli |
Basoli |
391926 |
Basoli |
Functional |
73.00 |
100.00 |
No |
48.87000 |
46.55000 |
46.50000 |
4.50000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 44 |
8176945 |
RETROFITTING OF BADKA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Baraut |
Baraka |
391976 |
Baraka |
Functional |
80.00 |
100.00 |
No |
39.46000 |
33.64800 |
33.64000 |
33.64000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 45 |
8178157 |
RETROFITTING OF DOLCHA W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
Pilana |
Dolcha |
392112 |
Dolcha |
Functional |
65.00 |
100.00 |
No |
41.16000 |
39.37000 |
39.33000 |
39.33000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |
| 46 |
8177068 |
RETROFITTING OF SAROORPUR KALAN W/S SCHEME |
2020-2021 |
Retrofit |
Completed |
Baghpat |
BAGHPAT |
SAROORPUR KALAN |
392049 |
SAROORPUR KALAN |
Functional |
68.00 |
100.00 |
No |
44.55000 |
41.91900 |
41.87000 |
41.87000 |
0.00000 |
OLD RETROFIT |
Financially Closed At Division Level |