Total Scheme : 63
O&M Scheme : 39
Under Trial Run Scheme : 9
In-Progress Scheme : 15

Physical Progress(Phase 1) All Scheme

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 53 OHT
  • 2 CWR
  • 341.47 D.System
  • 158 Comissioning
  • 2 Electricity
  • 20087 FHTC
  • 1129 HGJ
  • 2014 HGJ CERT
  • 6157 HOV
  • Scheme Wise Category A
  • 775 No. of Schemes
  • 1361 No. of Villages
  • Scheme Wise Category B
  • 3661 No. of Schemes
  • 6817 No. of Villages
  • Scheme Wise Category C
  • 1299 No. of Schemes
  • 1935 No. of Villages
  • Scheme Wise Total
  • 5735 Total No. of Schemes
  • 10113 Total No. of Villages
  • Village Wise Category A
  • 1132 No. of Villages
  • Village Wise Category B
  • 5653 No. of Villages
  • Village Wise Category C
  • 3124 No. of Villages
  • Village Wise Total
  • 9909 Total No. of Villages
  • 4671 Agreement Done Scheme
  • 8374 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
Total Schemes : 63 6547 49 51 44 44 44 3916 3801 0 0 10044 9595 96%
+0
5691
87 98.99 61 166 / 16 100.00 62 359 / 17
+0
550 / 550
213 / 83 1699
+0
1684
841 5 1 6 26
  +0
1612 | 1646
1578 0 / 0 1307 / 104 1136 -- -- -- 48 47 229 883 46 44 221 817 -- 0 0 1699 505 191 817 1003 280 218 9 + 12 + 3 + 58 + 6 = 88 9 + 16 + 3 + 112 + 7 = 147 1406 1172 361128 2527896 10833840 351628 97.37% 2585538 11079101 455
+0
453
+0
453
453 58095.78
+0.00
57754.31
6547 1685084 5417
+ 2
4529
1665001 0 0 98.81
+0
900 / 898
+0
6312 / 5241
1624724.00
+0.00 / +60926.49
1448305.80
89.14% 4 6 6 19761 16833 2928 1902 886 1016
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 1 1 1 342 342 0 0 691 680 98%
+0
332
97 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Verified Verified 22 114 Verified Verified 18 86 Verification Remarks Minutes of Meeting 0 0 116 0 11 86 105 11 3 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 131 120 39218 274526 1176540 34311 87.49% 230611 949167 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 342
+ 0
324
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +6033.92
142656.23
91.26% 1473 1171 302 112 91 21
  • 18 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 97 No. of OHT in O&M Schemes
  • 29813 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 579 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 12 64 Verification Remarks Minutes of Meeting 0 0 80 0 0 64 80 25 19 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 85 63 27904 195328 837120 29608 106.11% 211395 1012960 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +735.01
88170.52
94.58% 2316 2107 209 85 58 27
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 2 2 2 544 544 0 0 1271 1259 99%
+0
532
97.79 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 34 184 2 2 30 184 -- 0 0 196 0 11 150 185 36 22 0 + 0 + 0 + 6 + 0 = 6 0 + 0 + 0 + 8 + 0 = 8 216 183 67122 469854 2013660 63919 95.23% 442006 1962127 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 544
+ 0
525
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +6768.93
230826.75
92.50% 0 0 0 3789 3278 511 197 149 48
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 92 75 82%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 1 0 0
  +0
27 | 27
25 0 / 0 4 / 0 3 Integrated Verified Verified 0 26 Verified Verified 0 25 Verification Remarks Minutes of Meeting 0 0 28 5 1 25 22 11 4 1 + 0 + 0 + 0 + 0 = 1 1 + 0 + 0 + 0 + 0 = 1 23 22 5418 37926 162540 4365 80.56% 26051 113120 11
+0
11
+0
11
11 882.90
+0.00
876.45
69 19570 69
+ 0
50
19570 0 0 100.00
+0
13 / 13
+0
65 / 62
30332.00
+0.00 / +1449.54
23608.05
77.83% 181 147 34 31 2 29
  • 1 OHT
  • 6 D.System
  • 4 COV
  • 19 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
May-26
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 31-May-2026 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 122 HGJ Certified
  • 87.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 43 No. of Schemes
  • 102 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 55 No. of Villages
  • Village Wise Category B
  • 42 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 81 Total No. of OHT
  • 19 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5482 Water Demand(M3)
  • 18332.54 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 59 57 97%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 0 0 17 0 11 17 6 5 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 10 1231 8617 36930 218 17.71% 7905 77132 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
59
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +591.52
20939.14
98.03% 150 131 19 22 1 21
  • 8 D.System
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 304 221 73%
+0
188
66 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 0
  +0
91 | 91
86 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 28 Verified Not Verified 5 23 Verification Remarks Minutes of Meeting 0 0 91 7 42 23 42 16 0 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 2 = 2 122 114 14008 98056 420240 9534 68.06% 67116 250878 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 2
98
86114 0 0 99.95
+0
21 / 21
+0
250 / 180
95975.00
+0.00 / +3828.28
77188.06
80.43% 678 454 224 118 2 116
  • 205 D.System
  • 34 COV
  • 43 FHTC
  • 2 HGJ
  • 188 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 363 278 77% 242 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 0
  +0
108 | 108
103 0 / 0 51 / 0 15 -- -- -- 2 1 10 45 2 1 8 40 -- 0 0 108 7 53 40 48 21 1 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 2 = 2 136 124 15239 106673 457170 9752 63.99% 75021 328010 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
345 98082 343
+ 2
157
98039 0 0 100
+0
28 / 28
+0
309 / 239
117334.00
+0.00
98127.20
84% 828 585 243 140 3 137
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 455 353 78%
+0
299
72.22 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 1 0 0
  +0
135 | 135
128 0 / 0 55 / 0 18 -- -- -- 3 2 10 71 3 2 8 71 -- 0 0 136 12 54 65 70 32 5 1 + 0 + 0 + 0 + 1 = 2 1 + 0 + 0 + 0 + 2 = 3 159 146 20657 144599 619710 14118 68.34% 101073 441130 37
+0
37
+0
37
37 4510.90
+0.00
4290.36
414 117652 412
+ 2
204
117609 0 0 99.96
+0
41 / 41
+0
374 / 301
147666.00
+0.00 / +5869.34
121735.25
82.44% 0 0 0 1009 732 277 171 5 166
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Not Verified Not Verified 0 3 Not Verified Not Verified 0 3 Verification Remarks Minutes of Meeting 0 0 130 118 12 3 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 85 81 0 0 0 0 0% 3213 31548 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes 1140 858 282 88 39 49
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 22187.98 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 129 20-Mar-2024 1 1 1 1 129 128 0 0 412 411 100%
+0
129
100 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Verified Verified 6 43 Verified Verified 6 41 Verification Remarks Minutes of Meeting 0 0 46 0 4 41 42 11 13 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 31 18 11890 83230 356700 15087 126.89% 106813 478053 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
129 45475 129
+ 0
128
45475 0 0 100.00
+0
10 / 10
+0
129 / 129
39878.00
+0.00 / +1128.77
37750.20
94.66% 974 915 59 58 52 6
  • 1 HGJ CERT
  • 127 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 0 0 859 857 100%
+0
320
99.38 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 1 1 6 46 1 1 6 46 -- 0 0 176 118 16 44 42 11 13 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 4 + 0 = 4 116 99 11890 83230 356700 15087 126.89% 110026 509601 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
322 105150 322
+ 0
319
105150 0 0 100
+0
83 / 83
+0
322 / 322
66979.00
+0.00 / +1128.77
63469.72
94.76% 0 1 0 2114 1773 341 146 91 55
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 1123 963 86%
+0
229
45 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
271 0 0 5 25
  +0
234 | 242
189 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 171 162 0 0 0 0 0% 0 0 5
+0
5
+0
5
5 2511.00
+0.00
2507.80
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +2014.21
51396.42
98.53% 729 383 346 103 59 44
  • 30 OHT
  • 3 D.System
  • 5 COV
  • 2 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-May-2026
Comissioning
0
  • 31-May-2026 Intake
  • 31-May-2026 WTP
  • 31-May-2026 T/W
  • 31-May-2026 OHT
  • 31-May-2026 CWR
  • 31-May-2026 D.System
  • 31-May-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 55 HGJ Certified
  • 90.16 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 3449.25 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 168 132 79%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 20 19 0 0 0 0 0% 0 0 7
+0
7
+0
7
7 495.00
+0.00
494.49
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 37
20745.00
+0.00 / +1327.47
7276.12
35.07% 79 44 35 16 3 13
  • 3 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
31-May-2026
Comissioning
0
  • 31-May-2026 Intake
  • 31-May-2026 WTP
  • 31-May-2026 T/W
  • 31-May-2026 OHT
  • 31-May-2026 CWR
  • 31-May-2026 D.System
  • 31-May-2026 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 162 131 81%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 2 + 0 + 0 + 0 + 0 = 2 2 + 0 + 0 + 0 + 0 = 2 26 25 0 0 0 0 0% 0 0 6
+0
6
+0
6
6 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +480.14
4250.57
32.31% 69 20 49 22 21 1
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
31-May-2026
Comissioning
0
  • 31-May-2026 Intake
  • 31-May-2026 WTP
  • 31-May-2026 T/W
  • 31-May-2026 OHT
  • 31-May-2026 CWR
  • 31-May-2026 D.System
  • 31-May-2026 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1453 1226 84% 302 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
300 0 0 5 26
  +0
261 | 270
215 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 2 + 0 + 0 + 0 + 0 = 2 2 + 0 + 0 + 0 + 0 = 2 217 206 0 0 0 0 0% 0 0 18
+0
18
+0
18
18 3431.00
+0.00
3426.54
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 171
86063.00
+0.00
62923.11
73% 877 447 430 141 83 58
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 1 197 158 0 0 496 495 100%
+0
180
91 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Verified Verified 9 50 Verified Verified 9 50 Verification Remarks Minutes of Meeting 0 0 56 0 13 50 43 22 14 1 + 3 + 3 + 6 + 4 = 17 1 + 6 + 3 + 6 + 4 = 20 53 47 11597 81179 347910 10403 89.70% 79030 193539 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 197
+ 0
180
43098 0 0 100.00
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +3673.01
44913.13
88.76% 363 255 108 42 42 0
  • 17 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 1 4 1 1 1 197 158 0 0 1949 1720 88%
+0
482
56.24 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
356 0 0 5 26
  +0
317 | 326
271 0 / 0 169 / 0 24 -- -- -- 1 1 9 50 1 1 9 50 -- 0 0 357 301 13 50 43 22 14 3 + 3 + 3 + 6 + 4 = 19 3 + 6 + 3 + 6 + 4 = 22 270 253 11597 81179 347910 10403 89.70% 79030 193539 29
+0
29
+0
29
29 5146.00
+0.00
5141.54
857 184499 413
+ 0
274
180667 0 0 97.92
+0
156 / 154
+0
842 / 368
136662.00
+0.00 / +7494.83
107836.24
78.91% 0 0 0 1230 692 538 181 123 58
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 222 196 88%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 13 12 1 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 47 44 0 0 0 0 0% 0 0 8
+0
8
+0
8
8 899.95
+0.00
899.00
87 32259 75
+ 0
9
32201 0 0 99.82
+0
9 / 9
+0
85 / 63
29730.00
+0.00 / +295.84
26146.92
87.95% 321 198 123 33 19 14
  • 2 COV
  • 58 FHTC
  • 12 HGJ
  • 78 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 52 No. of Villages
  • Village Wise Category C
  • 18 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 170 134 79%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 51 51 0 0 0 0 0% 0 0 9
+0
9
+0
9
9 786.55
+0.00
786.00
93 27437 31
+ 0
8
27279 0 0 99.42
+0
10 / 10
+0
86 / 58
29676.00
+0.00 / +0.00
18958.13
63.88% 238 111 127 34 15 19
  • 7 COV
  • 158 FHTC
  • 62 HGJ
  • 85 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 184 171 93%
+0
30
28 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 44 44 0 0 0 0 0% 0 0 11
+0
11
+0
11
11 868.26
+0.00
863.85
106 27423 28
+ 0
1
27176 0 0 99.10
+0
12 / 12
+0
87 / 36
29490.00
+0.00 / +5605.63
25567.66
86.70% 123 64 59 41 20 21
  • 4 D.System
  • 19 COV
  • 247 FHTC
  • 78 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 576 501 87% 70 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 12 / 0 23 -- -- -- -- 0 0 40 39 1 0 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 142 139 0 0 0 0 0% 0 0 28
+0
28
+0
28
28 2554.76
+0.00
2548.85
286 87119 134
+ 0
18
86656 0 0 99
+0
31 / 31
+0
258 / 157
88896.00
+0.00
70672.71
80% 682 373 309 108 54 54
Indian Hume Pipe


8010037 Kuraicha GOV 74 05-Feb-2024 1 1 1 1 74 72 0 0 289 288 100%
+0
69
93 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 0 0 14 0 0 14 14 0 1 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 16 10 8491 59437 254730 9963 117.34% 77862 370852 11
+0
11
+0
11
11 859.73
+0.00
859.37
74 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 343 317 26 25 23 2
  • 9 FHTC
  • 1 HGJ
  • 4 HGJ CERT
  • 74 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 65 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 0 0 5 0 0 5 5 1 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 2 1930 13510 57900 1788 92.64% 14520 64306 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +106.46
6711.81
89.29% Yes 115 111 4 5 5 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 75 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 0 0 7 0 0 7 7 1 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 5 3419 23933 102570 3338 97.63% 23275 110078 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
37
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +159.50
11923.47
94.31% Yes 142 134 8 6 5 1
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 0 0 7 0 0 7 7 5 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 3346 23422 100380 1527 45.64% 23085 106037 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 66 64 2 19 18 1
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 0 0 14 0 0 14 14 1 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 11 8009 56063 240270 9179 114.61% 91933 349372 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
55
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +162.18
26962.89
96.32% Yes 294 261 33 16 15 1
  • 4 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 427 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 0 0 33 0 0 33 33 8 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 25 18 16704 116928 501120 15832 94.78% 152813 629793 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
158
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56463.15
95% 617 570 47 46 43 3
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Off Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 0 0 6 0 0 6 6 0 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 4025 28175 120750 8533 212% 58167 254834 3
+0
3
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +435.15
9021.80
92.97% Yes 219 214 5 5 4 1
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 257 257 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 0 0 9 0 0 9 9 0 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 4211 29477 126330 6103 144.93% 56300 229347 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +1148.73
13881.43
94.79% Yes 184 182 2 14 12 2
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1621 1544 95%
+0
388
63.40 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 0 0 102 39 1 62 62 8 21 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 5 + 0 = 5 187 170 33432 234024 1002960 40431 120.94% 345143 1484825 67
+0
67
+0
67
67 5890.10
+0.00
5883.83
612 201505 459
+ 0
335
201033 0 0 99.77
+0
117 / 117
+0
582 / 478
200615.00
+0.00 / +7913.49
177993.17
88.72% 0 0 3 2045 1656 389 198 136 62
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Off Verified Verified 7 13 Verified Verified 7 12 Verification Remarks Minutes of Meeting 0 0 13 0 0 12 13 1 6 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 2 1 4106 28742 123180 5522 134.49% 39530 142001 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +134.86
17578.70
99.83% Yes 127 124 3 25 25 0
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 16 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 11090.69 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 5 17 Verified Verified 5 15 Verification Remarks Minutes of Meeting 0 0 17 0 0 15 17 2 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 21 15 6661 46627 199830 6578 98.75% 48834 246581 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +2740.85
23998.94
97.56% 321 285 36 24 24 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Verified Verified 2 13 Verified Verified 2 13 Verification Remarks Minutes of Meeting 0 0 15 0 0 13 15 0 9 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 17 16 5836 40852 175080 10362 177.55% 58366 268143 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
54
17590 0 0 100.00
+0
6 / 6
+0
60 / 59
23368.00
+0.00 / +179.11
22206.49
95.03% 204 179 25 26 26 0
  • 6 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 54 98%
+0
57
98 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 10 Verified Verified 2 9 Verification Remarks Minutes of Meeting 0 0 11 0 0 9 11 1 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 6 2917 20419 87510 4441 152.25% 30551 172571 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 58
15059.00
+0.00 / +136.63
14955.24
99.31% 93 85 8 12 12 0
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 61 98%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 0 0 4 0 0 10 4 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 3 1696 11872 50880 3234 190.68% 21826 94943 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +172.28
5976.98
100.00% 61 54 7 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 923 6461 27690 0 0% 0 0 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +146.63
4881.97
81.42% 54 53 1 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 555 100% 249 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 21 63 5 5 21 59 -- 0 0 66 0 0 59 66 4 24 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 51 41 22139 154973 664170 30137 136.13% 199107 924239 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
238
73409 0 0 100
+0
37 / 37
+0
251 / 249
92606.00
+0.00
89598.32
97% 860 780 80 96 96 0
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 15 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 1 1 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 0 0 6 0 2 0 4 1 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 1070 7490 32100 1119 104.58% 4796 18888 3
+0
3
+0
3
3 108.90
+0.00
108.90
15 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
15 / 15
4615.00
+0.00 / +295.45
3841.40
83.24% 48 43 5 5 4 1
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 0 0 4 0 0 4 4 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 2209 197.76% 15346 68472 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +310.08
4075.86
88.34% Yes 29 29 0 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 1 1 1 1 23 20 0 0 54 53 98%
+0
13
57 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 0 0 8 0 0 8 8 0 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 14 2551 17857 76530 4848 190.04% 29979 120896 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
19
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +749.32
8027.09
91.28% 112 72 40 12 10 2
  • 4 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 0 0 8 0 0 8 8 0 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 1989 13923 59670 3439 172.90% 25206 101421 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +553.44
8610.34
97.45% Yes 41 34 7 9 9 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 0 0 12 0 0 12 12 0 7 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 14 3126 21882 93780 4980 159.31% 33959 133135 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 32
9528.00
+0.00 / +184.85
9028.53
94.76% 178 134 44 18 16 2
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 0 0 4 0 0 4 4 0 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 7 1875 13125 56250 4091 218.19% 24149 99496 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +463.36
5052.79
84.12% 66 52 14 6 6 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 5 5 5 5 119 113 0 0 215 214 100% 109 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 0 0 36 0 0 36 36 0 24 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 44 41 10658 74606 319740 19567 183.59% 128639 523420 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
114
35931 0 0 100
+0
21 / 21
+0
119 / 119
37779.00
+0.00
34794.61
92% 426 321 105 52 48 4
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 0 0 7 0 0 7 7 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 5 4365 30555 130950 4045 92.67% 41584 162111 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 45
14171.00
+0.00 / +941.01
13523.42
95.43% 205 196 9 17 13 4
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Verified Verified 5 9 Verified Verified 5 9 Verification Remarks Minutes of Meeting 0 0 10 0 0 9 10 2 4 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 20 18 4224 29568 126720 5782 136.88% 25885 116808 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 50
13299.00
+0.00 / +155.76
11725.18
88.17% 306 262 44 23 11 12
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 0 0 15 0 0 15 15 2 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 6 4790 33530 143700 5154 107.60% 44795 181222 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +515.23
15925.10
95.47% 175 164 11 20 19 1
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 15 31 3 3 15 31 -- 0 0 32 0 0 31 32 4 10 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 36 29 13379 93653 401370 14981 111.97% 112264 460141 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 139
44151.00
+0.00
41173.70
93% 686 622 64 60 43 17
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 0 0 8 0 0 8 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1277 8939 38310 1330 104.15% 9252 40587 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 36 36 0 6 6 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 16 16 16 16 550 540 0 0 1143 1140 100%
+0
538
97.82 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 55 139 15 14 54 139 -- 0 0 148 0 2 134 146 9 60 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 4 + 0 = 4 134 114 48529 339703 1455870 67132 138.33% 454058 1967277 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
550 156973 549
+ 0
531
156973 0 0 100
+0
86 / 86
+0
549 / 541
183187.00
+0.00 / +7678.86
172842.42
94.35% 0 2 0 2050 1796 254 214 192 22
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 60 01-Dec-2023 1 1 1 1 60 60 0 0 201 201 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 0 0 18 0 2 18 16 6 5 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 4 + 0 = 4 14 11 5898 41286 176940 6891 116.84% 49471 200791 6
+0
6
+0
6
6 672.57
+0.00
672.20
60 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
60 / 60
27118.00
+0.00 / +776.53
27118.00
100.00% Yes Yes Yes 379 340 39 11 0 11
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 74 Villages
  • 26604 Households
  • 0 Last Week FHTC Given
  • 26428 FHTC Given
  • 99 FHTC(%)
  • 176 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 85.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 66.22 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 35 Schemes Sent to O&M
  • 37 No. of OHT in O&M Schemes
  • 6579 Water Demand(M3)
  • 6556.83 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 75 15-Mar-2024 1 1 1 1 75 74 0 0 235 235 100%
+0
75
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Verified Verified 8 31 Verified Verified 8 30 Verification Remarks Minutes of Meeting 0 0 32 0 8 30 24 8 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 15 8 4669 32683 140070 4307 92.25% 39862 178991 10
+0
10
+0
10
10 601.08
+0.00
599.17
75 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
75 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 485 446 39 22 4 18
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 0 0 40 0 0 40 40 12 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 25 13 6961 48727 208830 7145 102.64% 53111 234205 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +74.30
26008.94
100.00% 353 312 41 20 2 18
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 152 2 2 2 2 152 151 0 0 467 467 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 30 71 2 2 30 70 -- 0 0 72 0 8 70 64 20 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 40 21 11630 81410 348900 11452 98.47% 92973 413196 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
152 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
152 / 150
49611.00
+0.00
48943.08
99% 838 758 80 42 6 36
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 36 01-Jul-2024 1 1 1 1 36 35 0 0 158 157 99%
+0
34
94 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 12 Verified Verified 0 2 Verification Remarks Minutes of Meeting 0 0 13 0 3 2 10 9 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 4 2883 20181 86490 748 25.95% 4949 24746 9
+0
9
+0
9
9 349.51
+0.00
349.35
36 11799 36
+ 0
35
11799 0 0 100.00
+0
9 / 9
+0
36 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes 0 0 0 0 0 0
  • 1 HGJ CERT
  • 36 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 305 293 96%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 1 24 Verified Verified 1 23 Verification Remarks Minutes of Meeting 0 0 29 0 10 23 19 14 0 0 + 0 + 0 + 1 + 1 = 2 0 + 0 + 0 + 2 + 1 = 3 40 38 5865 41055 175950 1579 26.92% 21717 78450 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +1458.55
28849.34
86.63% 657 488 169 4 0 4
  • 1 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 343 5 5 4 4 4 248 246 0 0 1131 1115 99%
+0
336
97.96 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 37 125 5 5 37 125 -- 0 0 132 0 23 113 109 49 21 0 + 0 + 0 + 5 + 1 = 6 0 + 0 + 0 + 6 + 1 = 7 101 74 26277 183939 788310 20670 78.66% 169109 717183 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
343 112046 343
+ 0
328
112046 0 0 100
+0
59 / 59
+0
343 / 338
125817.00
+0.00 / +2309.38
118457.11
94.15% 2 2 3 1874 1586 288 57 6 51
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Verified Verified 1 2 Not Verified Not Verified 1 1 Verification Remarks Minutes of Meeting 0 0 12 0 0 1 12 0 6 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 9 + 0 = 9 12 12 7608 53256 228240 11185 147.02% 46306 215967 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +688.47
25970.57
96.54% 205 182 23 17 1 16
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 55 No. of Schemes
  • 109 No. of Villages
  • Scheme Wise Category C
  • 16 No. of Schemes
  • 22 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 55 Schemes Sent to O&M
  • 57 No. of OHT in O&M Schemes
  • 11888 Water Demand(M3)
  • 11111.00 Water Supply (M3)
  • 55 Agreement Done Scheme
  • 109 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 0 0 15 0 5 7 10 1 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 5 2925 20475 87750 3421 116.96% 29409 161516 6
+0
6
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 207 196 11 20 0 20
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 141 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
100 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Verified Verified 5 5 Verified Verified 4 5 Verification Remarks Minutes of Meeting 0 0 12 0 0 5 12 5 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 6 9559 66913 286770 7626 79.78% 46745 233725 7
+0
7
+0
7
7 723.50
+0.00
723.50
141 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
141 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 292 278 14 38 0 38
  • 118 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 213 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
100 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Verified Verified 6 10 Verified Verified 6 10 Verification Remarks Minutes of Meeting 0 0 25 0 2 10 23 13 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 9 13804 96628 414120 2608 18.89% 66874 332607 11
+0
11
+0
11
11 1327.06
+0.00
1327.06
213 42736 212
+ 0
207
42734 0 0 100.00
+0
13 / 13
+0
213 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 428 408 20 54 2 52
  • 2 FHTC
  • 1 HGJ
  • 6 HGJ CERT
  • 173 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 440 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 14 22 3 3 13 22 -- 0 0 52 0 7 22 45 19 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 20 26288 184016 788640 13655 51.94% 143028 727848 24
+0
24
+0
24
24 3022.67
+0.00
3022.67
440 92848 439
+ 0
434
92846 0 0 100
+0
29 / 29
+0
440 / 437
81119.00
+0.00
77310.33
95% 927 882 45 112 2 110
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 0 0 30 0 0 29 30 0 5 1 + 3 + 0 + 0 + 0 = 4 1 + 3 + 0 + 0 + 0 = 4 18 11 11587 81109 347610 14219 122.72% 95891 404282 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +325.76
29948.30
91.23% Yes Yes 311 288 23 26 2 24
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 0 0 25 0 0 23 25 0 2 4 + 0 + 0 + 0 + 0 = 4 4 + 0 + 0 + 0 + 0 = 4 12 10 11812 82684 354360 13207 111.81% 91768 431397 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 255
33415.00
+0.00 / +187.66
31276.44
93.60% Yes Yes 402 380 22 43 5 38
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 0 0 55 0 0 52 55 0 7 5 + 3 + 0 + 0 + 0 = 8 5 + 3 + 0 + 0 + 0 = 8 30 21 23399 163793 701970 27426 117.21% 187659 835679 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 414
66243.00
+0.00
61224.74
92% 713 668 45 69 7 62
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Verified 1 58 Verified Verified 1 55 Verification Remarks Minutes of Meeting 0 0 102 0 0 55 102 39 7 0 + 3 + 0 + 14 + 0 = 17 0 + 3 + 0 + 26 + 0 = 29 18 5 25287 177009 758610 20582 81.39% 142884 612105 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 1118 1095 23 107 23 84
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Verified Verified 0 2 Not Verified Verified 0 2 Verification Remarks Minutes of Meeting 0 0 5 0 5 2 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 4 0 0 0 0 0% 0 6477 1
+0
1
+0
1
1 248.50
+0.00
248.50
63 9280 62
+ 0
60
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +470.29
6413.97
98.71% 76 69 7 11 0 11
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 263 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Verified Verified 0 32 Verified Verified 0 31 Verification Remarks Minutes of Meeting 0 0 48 0 4 31 44 22 4 0 + 3 + 0 + 1 + 0 = 4 0 + 4 + 0 + 1 + 0 = 5 8 3 13465 94255 403950 9246 68.67% 70527 309036 2
+0
2
+0
2
2 1344.50
+0.00
1344.50
263 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +32.69
12393.12
95.46% 580 569 11 61 38 23
  • 2 COV
  • 136 FHTC
  • 4 HGJ
  • 13 HGJ CERT
  • 242 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 9 9 31 169 7 8 30 169 -- 0 0 274 0 16 163 258 80 32 5 + 9 + 0 + 17 + 0 = 31 5 + 10 + 0 + 36 + 0 = 51 105 65 96048 672336 2881440 82094 85.47% 590403 2707113 50
+0
50
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1600
+ 0
1573
310295 0 0 99.76
+0
200 / 200
+0
1599 / 1569
200307.00
+0.00 / +1704.87
189875.73
94.79% 2 0 0 3619 3465 154 375 71 304
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Off Not Verified Verified 12 22 Not Verified Verified 12 22 Verification Remarks Minutes of Meeting 0 0 27 3 1 22 23 7 8 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 23 + 0 = 23 21 8 16714 116998 501420 17188 102.84% 99565 342634 16
+0
16
+0
16
16 3904.00
+0.00
3904.00
179 66179 157
+ 0
102
64291 0 0 97.15
+0
14 / 14
+0
153 / 73
74794.00
+0.00 / +4591.26
65085.22
87.02% 446 421 25 68 0 68
  • 18 COV
  • 1888 FHTC
  • 22 HGJ
  • 77 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 31-Mar-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17544 FHTC Given
  • 96 FHTC(%)
  • 625 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 37 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 0 0 0 0 0% 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +15.95
9174.10
73.49% 23 12 11 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 11 8 0 3 3 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 2710 18970 81300 33 1.22% 10285 36125 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +185.85
7419.11
62.50% 12 7 5 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Verified Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 0 0 15 0 0 0 15 9 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 6 6425 44975 192750 4664 72.59% 54730 229027 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
25
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +723.53
13244.00
100.00% 107 100 7 11 2 9
  • 4 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 52 0 0 0 0 0 0 0 0 63 63 100%
+0
52
100 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 9
+0
7
2 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 9 9 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 16 0 0 0 0 0% 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
52 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 7
23765.00
+0.00 / +502.43
15430.89
64.93% 41 20 21 22 0 22
  • 2 OHT
  • 13 D.System
  • 52 COV
  • 5255 FHTC
  • 34 HGJ
  • 52 HGJ CERT
  • 52 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
Agency Total 95 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 45
+3
35
5 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 1 0 0 0 -- 0 0 45 27 0 0 18 12 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 27 27 9135 63945 274050 4697 51.42% 65015 265152 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
95 51213 47
+ 0
25
42104 0 0 82
+0
20 / 20
+0
33 / 39
61363.00
+0.00
45268.10
74% 183 139 44 35 3 32
NCC Ltd.


8338933 Patwadh GOV 650 0 0 0 0 0 0 0 0 194 191 98%
+0
596
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
55 0 / 0 45 / 0 0 Integrated Verified Verified 1 4 Verified Verified 1 3 Verification Remarks Minutes of Meeting 0 0 55 0 37 3 18 1 13 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 53 23 4777 33439 143310 8500 177.94% 51533 199665 15
+0
15
+0
15
15 3885.16
+0.00
3513.19
650 101050 206
+ 0
25
97852 0 0 96.84
+0
16 / 16
+0
608 / 371
99181.00
+0.00 / +10938.06
83938.49
84.63% 828 750 78 181 95 86
  • 371 D.System
  • 42 COV
  • 3198 FHTC
  • 444 HGJ
  • 625 HGJ CERT
  • 646 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
31-May-2026
Comissioning
31/05/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 31-May-2026 D.System
  • 31-May-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 0 0 12 0 0 0 12 5 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 7826 54782 234780 3931 50.23% 27345 111960 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +358.09
10929.93
91.54% Yes 33 33 0 4 2 2
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 1
+0
1
+0
1
1 102.16
+0.00
100.19
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 2
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 4 2 2 0 0 0
  • 1 OHT
  • 1 D.System
  • 3 COV
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 0 0 8 0 0 2 8 5 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 4 4 1958 13706 58740 539 27.53% 11510 34865 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +1083.75
9191.10
97.03% 30 24 6 11 1 10
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 1 1 1 80 42 0 0 64 64 100%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Verified Verified 1 9 Verified Verified 1 9 Verification Remarks Minutes of Meeting 0 0 9 0 3 9 6 3 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 3 2865 20055 85950 0 0% 26874 103583 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 78
12858.00
+0.00 / +0.00
11482.31
89.30% 98 88 10 18 1 17
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 20-Mar-2026 0 0 0 0 0 0 0 0 33 33 100%
+0
180
97 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 0 0 9 2 4 0 3 0 2 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 5 1 2300 16100 69000 2919 126.91% 12847 38449 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
186 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
182 / 174
23145.00
+0.00 / +1329.63
20488.45
88.52% 345 334 11 41 6 35
  • 2 D.System
  • 3 COV
  • 105 FHTC
  • 3 HGJ
  • 53 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 0 0 10 0 10 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 0 0 0 0 0 0 0% 0 0 6
+0
6
+0
6
6 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +329.47
16072.90
88.16% 64 64 0 10 6 4
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
Agency Total 361 4 1 1 1 80 42 0 0 169 169 100% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 1 0
  +0
38 | 38
36 0 / 0 1 / 0 30 -- -- -- 3 2 1 11 3 2 1 11 -- 0 0 39 5 17 11 17 8 2 0 + 0 + 0 + 5 + 0 = 5 0 + 0 + 0 + 14 + 0 = 14 17 10 7123 49861 213690 3458 48.55% 51231 176897 20
+0
20
+0
20
20 4824.34
+0.00
4817.30
361 58561 353
+ 0
277
57781 0 0 99
+0
25 / 25
+0
351 / 289
66677.00
+0.00
60047.67
90% 541 512 29 80 14 66
Total Sonbhadra 1297 7 6 3 3 3 121 83 0 0 546 542 99%
+0
1206
92.98 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 178
+0
168
5 5 0 1 0
  +0
162 | 162
156 0 / 0 106 / 0 72 -- -- -- 5 5 14 37 5 4 14 37 -- 0 0 178 35 55 36 88 33 30 0 + 0 + 0 + 16 + 0 = 16 0 + 0 + 0 + 43 + 0 = 43 118 68 45576 319032 1367280 37774 82.88% 294690 1096306 77
+0
75
+0
75
75 15534.95
+0.00
15142.13
1297 286048 775
+ 0
440
271073 0 0 94.76
+0
83 / 83
+0
1157 / 784
313955.00
+0.00 / +20058.02
265269.41
84.49% 0 1 0 2031 1855 176 363 113 250
Project Completion Plan

Minutes of Meeting Date -